Construction Project Management - S. Keoki Sears - E-Book

Construction Project Management E-Book

S. Keoki Sears

0,0
113,99 €

-100%
Sammeln Sie Punkte in unserem Gutscheinprogramm und kaufen Sie E-Books und Hörbücher mit bis zu 100% Rabatt.

Mehr erfahren.
Beschreibung

A thoroughly updated edition of the classic guide to project management of construction projects

For more than thirty years, Construction Project Management has been considered the preeminent guide to all aspects of the construction project management process, including the Critical Path Method (CPM) of project scheduling, and much more. Now in its Sixth Edition, it continues to provide a solid foundation of the principles and fundamentals of project management, with a particular emphasis on project planning, demonstrated through an example project, along with new pedagogical elements such as end-of-chapter problems and questions and a full suite of instructor's resources.

Also new to this edition is information on the Earned Value Analysis (EVA) system and introductory coverage of Building Information Modeling (BIM) and Lean Construction in the context of project scheduling. Readers will also benefit from building construction examples, which illustrate each of the principles of project management. This information, combined with the case studies provided in the appendix, gives readers access to hands-on project management experience in the context of real-world project management problems.

  • Features two integrated example projects—one civil and one commercial—fully developed through the text
  • Includes end-of-chapter questions and problems
  • Details BIM in scheduling procedures, Lean Construction, and Earned Value Analysis, EVA
  • Provides teaching resources, including PowerPoint slides, interactive diagrams, and an Instructor's Manual with solutions for the end-of-chapter questions

Construction Management and Civil Engineering students and professionals alike will find everything they need, to understand and to master construction project management in this classic guide.

Sie lesen das E-Book in den Legimi-Apps auf:

Android
iOS
von Legimi
zertifizierten E-Readern

Seitenzahl: 615

Veröffentlichungsjahr: 2015

Bewertungen
0,0
0
0
0
0
0
Mehr Informationen
Mehr Informationen
Legimi prüft nicht, ob Rezensionen von Nutzern stammen, die den betreffenden Titel tatsächlich gekauft oder gelesen/gehört haben. Wir entfernen aber gefälschte Rezensionen.



Construction Project Management

A Practical Guide to Field Construction Management

Sixth Edition

S. Keoki Sears Glenn A. Sears Richard H. Clough Jerald L. Rounds Robert O. Segner, Jr.

Cover Design: Wiley Cover Images: Capsher Technology building photograph by Jennifer Olson, design by The Arkitex Studio, Inc.; Mesh Background © iStock.com/Zhenikeyev

This book is printed on acid-free paper.

Copyright © 2015 by John Wiley & Sons, Inc. All rights reserved.

Published by John Wiley & Sons, Inc., Hoboken, New Jersey. Published simultaneously in Canada.

No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning, or otherwise, except as permitted under Section 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, (978) 750-8400, fax (978) 646-8600, or on the web at www.copyright.com. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley & Sons, Inc., 111 River Street, Hoboken, NJ 07030, (201) 748-6011, fax (201) 748-6008, or online at www.wiley.com/go/permissions.

Limit of Liability/Disclaimer of Warranty: While the publisher and author have used their best efforts in preparing this book, they make no representations or warranties with the respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. No warranty may be created or extended by sales representatives or written sales materials. The advice and strategies contained herein may not be suitable for your situation. You should consult with a professional where appropriate. Neither the publisher nor the author shall be liable for damages arising herefrom.

For general information about our other products and services, please contact our Customer Care Department within the United States at (800) 762-2974, outside the United States at (317) 572-3993 or fax (317) 572-4002.

Wiley publishes in a variety of print and electronic formats and by print-on-demand. Some material included with standard print versions of this book may not be included in e-books or in print-on-demand. If this book refers to media such as a CD or DVD that is not included in the version you purchased, you may download this material at http://booksupport.wiley.com. For more information about Wiley products, visit www.wiley.com.

Library of Congress Cataloging-in-Publication Data:

Sears, S. Keoki.     Construction project management : a practical guide to field construction management. —Sixth edition/S. Keoki Sears [and 4 others].         pages cm     Includes index.     ISBN 978-1-118-74505-2 (hardback : acid-free paper); ISBN 978-1-118-74525-0 (ebk); ISBN 978-1-118-74526-7 (ebk)   1. Construction industry—Management. 2. Project management. I. Title.     TH438.S43 2015     690.068′4—dc23

2014041076

Contents

Preface

1 Construction Practices

1.1 Introduction

1.2 The Construction Industry

1.3 The Construction Project

1.4 Project Stages

1.5 Owner

1.6 Architect-Engineer

1.7 Prime Contractor

1.8 Competitive Bidding

1.9 Negotiated Contracts

1.10 Combined Bidding and Negotiation

1.11 Subcontracting

1.12 Design-Bid-Construct

1.13 Fast Tracking

1.14 Construction Contract Services

1.15 Construction Services

1.16 Design-Construct

1.17 Construction Management

1.18 Fixed-Sum Contract

1.19 Cost-Plus-Fee Contracts

1.20 Work-by-Force Account

1.21 Turnkey and BOT Contracts

1.22 Integrated Project Delivery

1.23 Speculative Construction

1.24 Management during the Design Phase

1.25 Management of Field Construction

1.26 Project Manager

1.27 Project Manager Qualifications

Key Points and Questions

2 Systematic Project Management

2.1 Introduction

2.2 Need for Project Management

2.3 Project Management Characteristics

2.4 Discussion Viewpoint

2.5 Management Procedures

2.6 Time and Cost Management

2.7 Planning and Scheduling

2.8 CPM Procedure

2.9 Time Monitoring and Control

2.10 Project Cost System

2.11 Estimating the Project

2.12 Project Cost Accounting

2.13 Resource Management

2.14 Project Financial Control

2.15 Automating Project Management Tasks

2.16 Manual Methods

2.17 Discussion Format

2.18 Example Projects

Key Points and Questions

3 Project Estimating

3.1 Introduction

3.2 Project Cost System

3.3 Preliminary Cost Estimates

3.4 Final Cost Estimate

3.5 Example Projects

3.6 Quantity Survey

3.7 Management Input

3.8 Field Supervision

3.9 Construction Methods

3.10 General Time Schedule

3.11 Construction Equipment

3.12 Summary Sheets

3.13 Material Costs

3.14 Labor Costs

3.15 Indirect Labor Costs

3.16 Labor Unit Costs

3.17 The Cost of Heavy Equipment

3.18 Bids from Subcontractor

3.19 Project Overhead

3.20 Home Office Overhead

3.21 Markup

3.22 Contract Bonds

3.23 Recap Sheet

3.24 Cost Models

3.25 Project Budget

3.26 Progress Estimate

3.27 Estimating for Changes

Key Points and Questions

4 Project Planning

4.1 Introduction

4.2 CPM Procedure

4.3 Planning Phase

4.4 Job Activities

4.5 Job Logic

4.6 Restraints

4.7 Beginning-to-End Planning

4.8 Top-Down Planning and the Work Breakdown Structure

4.9 Precedence Notation

4.10 Precedence Diagram

4.11 Network Format

4.12 Lag Relationships

4.13 Precedence Diagram for the Example Projects

4.14 Value of Precedence Network

4.15 Repetitive Operations

4.16 Network Interfaces

4.17 Master Network

4.18 Subnetworks

4.19 Computer Applications for Planning

Key Points and Questions

5 Project Scheduling Concepts

5.1 Introduction

5.2 Scheduling Procedure

5.3 Activity Times

5.4 Rules for Estimating Activity Durations

5.5 Estimating Activity Durations

5.6 Time Contingency

5.7 Project Weather Delays

5.8 Network Time Computations

5.9 Early Activity Times

5.10 Project Duration

5.11 Late Activity Times

5.12 Total Float

5.13 Critical Path

5.14 Free Float

5.15 Activity Time Information

5.16 Float Paths

5.17 Early-Start Schedule

5.18 Tabular Time Schedules

5.19 Activities and Calendar Dates

5.20 Calendars for Weather

5.21 Lags between Activities

5.22 Pipeline Scheduling Computations

5.23 Pipeline Summary Diagram

5.24 Interface Computations

5.25 Hammock Activity

5.26 Milestones

5.27 Time-Scaled Networks

5.28 Nature and Significance of Floats

5.29 Bar Charts

5.30 Computer Applications for Scheduling

Key Points and Questions

6 Production Planning

6.1 Introduction

6.2 Planning Team

6.3 Reengineering the Project

6.4 Planning for Production

6.5 Support Planning

6.6 Technical Problems

6.7 Personnel Planning

6.8 Safety Planning

6.9 Planning for Quality

6.10 Material Ordering and Expediting

6.11 Material Handling, Storage, and Protection

6.12 Equipment Planning

6.13 The New Production Model

Key Points and Questions

7 Managing Time

7.1 Introduction

7.2 Time Schedule Adjustments

7.3 Need for Time Reduction

7.4 General Time-Reduction Procedure

7.5 Shortening the Longest Time Path

7.6 Project Direct Costs

7.7 Variation of Activity Direct Cost with Time

7.8 Project Indirect Costs

7.9 Practical Aspects of Time Reduction

7.10 Reduction of the Highway Bridge Duration

7.11 Time Reduction of Highway Bridge by Expediting

7.12 Least-Cost Expediting of the Highway Bridge

7.13 Limitations on Time-Reduction Steps

7.14 Variation of Total Project Cost with Time

7.15 Expedited Highway Bridge Schedule

7.16 Milestone and Interface Events

7.17 Project Extension

7.18 Time Management System

7.19 Aspects of Time Management

7.20 Key-Date Schedules

7.21 Adjustment of Move-in Date

Key Points and Questions

8 Resource Management

8.1 Introduction

8.2 Objective of Resource Management

8.3 Project Resource Management

8.4 Aspects of Resource Management

8.5 Tabulation of Labor Requirements

8.6 Project Labor Summary

8.7 Variation in Labor Demand

8.8 Manpower Leveling

8.9 Heuristic Manpower Leveling

8.10 Numerical Example

8.11 Labor Leveling in Practice

8.12 Restricted Labor Supply

8.13 Complex Labor Scheduling

8.14 Equipment Management and Scheduling

8.15 The Construction Supply Chain

8.16 Material Scheduling

8.17 Resource Expediting

Key Points and Questions

9 Project Scheduling Applications

9.1 Introduction

9.2 Role of the Schedule

9.3 Operational Schedules

9.4 Organizing Schedule Data

9.5 Schedule Presentation Formats

9.6 Schedules for Repetitive Operations

9.7 Impacted Baseline Schedule

9.8 But-for or Collapsed As-Built Schedule

9.9 Legal Schedules

9.10 Handling Weather Effects and Other Unknowns

9.11 Presenting the Schedule

Key Points and Questions

10 Project Coordination

10.1 Introduction

10.2 Schedule Information on the Job

10.3 Detailed Schedules

10.4 Subcontractor Scheduling

10.5 Activity Planning

10.6 The Last Planner Process©

10.7 Production Checklists

10.8 Look-Ahead Schedules

10.9 Planning the Paperwork

10.10 Putting the Plans on Paper

10.11 Progress Measurement

10.12 Progress Reporting

10.13 Bar Charts

10.14 Highway Bridge as of July 14

10.15 Weekly Progress Reports

10.16 Field Progress Narrative

10.17 July 21 Status of Highway Bridge

10.18 Progress Analysis

10.19 Schedule Analysis to Determine Project Delays

10.20 Corrective Action

10.21 Network Updating

10.22 Updating Calculations Manually

10.23 Scheduling Software

10.24 Project Progress Curves

Key Points and Questions

Note

11 Project Cost System

11.1 Introduction

11.2 The Construction Cost Cycle

11.3 Objectives of a Cost System

11.4 Project Cost Control

11.5 Data for Estimating

11.6 Project Cost Code

11.7 Usage of Project Cost Code

11.8 Project Cost Accounting

11.9 Labor and Equipment Costs

11.10 Cost Accounting Reports

11.11 Labor Time Reporting

11.12 Time Card Preparation

11.13 Measurement of Work Quantities

11.14 Work Quantities from Network Activities

11.15 Cost Records and Reports

11.16 Weekly Labor Reports

11.17 Weekly Labor Cost Report

11.18 Equipment Cost Accounting

11.19 Monthly Cost Forecast

11.20 Time-Cost Envelope

11.21 Earned Value Management System

11.22 Forecasting Final Project Results Using the EVMS

11.23 Special Cost Accounting Problems

11.24 Production Cost Reduction

11.25 Information for Estimating

11.26 Postproject Evaluation

11.27 Software Applications

11.28 Accuracy of Estimating

Key Points and Questions

Note

12 Project Financial Management

12.1 Introduction

12.2 Financial Control

12.3 Progress Payments

12.4 Pay Requests for Unit-Price Contracts

12.5 Project Cost Breakdown

12.6 Pay Requests for Lump-Sum Contracts

12.7 Use of Time-Control Activities for Pay Requests

12.8 Pay Requests for Cost-Plus Contracts

12.9 Payments to Subcontractors

12.10 Schedule of Payments by Owner—Unit-Price Contract

12.11 Schedule of Payments by Owner—Lump-Sum Contract

12.12 Final Payment

12.13 Cash Flow

12.14 Cash Disbursement Forecasts

12.15 Cash Income Forecasts

12.16 Disbursement Controls

12.17 Project Changes

12.18 Contract Change Orders

12.19 Claims

12.20 Daily Job Log

Key Points and Questions

Index

End User License Agreement

List of Illustrations

Chapter 2

Figure 2.1a

Example heavy civil construction project

Figure 2.1b

Example commercial building project

Chapter 3

Figure 3.1a

Highway bridge, profile

Figure 3.1b

Highway bridge, transverse section

Figure 3.2a

Commercial building architectural floor plan

Figure 3.2b

Commercial building elevations

Figure 3.3

Highway bridge, bid form

Figure 3.4

Highway bridge, work quantities

Figure 3.5a

Highway bridge, general time schedule

Figure 3.5b

Commercial building, time schedule

Figure 3.6

Highway bridge, bid-item summary sheet

Figure 3.7

Highway bridge, overhead estimate

Figure 3.8

Highway bridge, recap sheet

Figure 3.9

Highway bridge, completed bid form

Figure 3.10a

Highway bridge, project budget

Figure 3.10b

Commercial building project budget

Chapter 4

Figure 4.1

Concrete footing, precedence diagram

Figure 4.2a

Highway bridge, general job plan

Figure 4.2b

Commercial building, general job plan

Figure 4.3

Pipeline relocation, basic plan

Figure 4.4

Pipeline relocation, precedence diagram planning

Figure 4.5

Pipeline crossing structure, precedence diagram planning

Figure 4.6

Mobilize pile-driving rig, precedence diagram planning

Chapter 5

Figure 5.1

Highway bridge, forward-pass calculations

Figure 5.2

Highway bridge, backward-pass calculations

Figure 5.3a

Highway bridge, activity times

Figure 5.3b

Commercial building, activity times

Figure 5.4a

Highway bridge, conversion calendar

Figure 5.4b

Commercial building, conversion calendar

Figure 5.5a

Highway bridge, early-start schedule

Figure 5.5b

Commercial building, early-start schedule

Figure 5.6

Lag relationships, precedence notation

Figure 5.7

Pipeline relocation, precedence diagram time computations

Figure 5.8

Pipeline relocation, summary precedence diagram

Figure 5.9

Pipeline crossing structure, precedence diagram time computations

Figure 5.10

Highway bridge, hammock activity

Figure 5.11

Highway bridge, bar chart schedule

Chapter 6

Figure 6.1a

Highway bridge, site layout

Figure 6.1b

Commercial building, site layout

Chapter 7

Figure 7.1

Activity time-cost variation

Figure 7.2

Highway bridge, critical activities in parallel

Figure 7.3

Highway bridge, subdivision of critical activity

Figure 7.4

Highway bridge, direct costs of expediting actions

Figure 7.5

Highway bridge, least-cost expediting

Figure 7.6

Highway bridge direct, cost of expediting

Figure 7.7

Highway bridge, variation of costs with duration

Figure 7.8

Highway bridge, expedited schedule

Figure 7.9

Time management cycle

Figure 7.10

Highway bridge, initial key-date schedule

Chapter 8

Figure 8.1

Highway bridge, activity manpower needs

Figure 8.2

Highway bridge, daily manpower compilation

Chapter 9

Figure 9.1a

Highway bridge, total float sort

Figure 9.1b

Commercial building, total float sort

Figure 9.2

Pipeline relocation line-of-balance schedule

Figure 9.3

Resolving line-of-balance conflicting activities

Figure 9.4

Five-mile transmission line

Figure 9.5

Average rainfall summarized by month and volume

Figure 9.6

Selection of weather days based on historical summary

Chapter 10

Figure 10.1

Highway bridge, initial detailed schedule

Figure 10.2

Concrete wall and column checklist

Figure 10.3

Highway bridge, seven-day look-ahead schedule

Figure 10.4

Highway bridge, bar chart as of July 14

Figure 10.5

Highway bridge, weekly progress report

Figure 10.6

Highway bridge, bar chart as of July 21

Figure 10.7

Revised network problem with activity 140

Figure 10.8

Change order process flowchart

Figure 10.9

Highway bridge, network update information

Figure 10.10

Project progress curves

Chapter 11

Figure 11.1

Cost cycle for a construction project

Figure 11.2

Highway bridge, daily labor time card

Figure 11.3

Highway bridge, weekly labor time card

Figure 11.4

Highway bridge, weekly work quantity report

Figure 11.5

Highway bridge, weekly labor cost report (#1)

Figure 11.6

Highway bridge, weekly labor cost report (#2)

Figure 11.7

Highway bridge, monthly cost forecast report

Figure 11.8

Time-cost envelope

Figure 11.9

Earned value management system

Chapter 12

Figure 12.1

Highway bridge, monthly pay request

Figure 12.2

Periodic estimate for partial payment, lump-sum contract

Figure 12.3

Highway bridge, schedule of progress payments

Figure 12.4

Highway bridge, contractor’s expense and income

Guide

Cover

Table of Contents

Preface

Pages

vii

viii

1

4

5

6

7

8

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

28

29

30

32

33

35

36

37

38

39

41

44

46

47

48

49

52

53

54

55

56

57

59

60

61

63

64

67

68

69

71

72

73

74

75

76

78

79

80

81

82

84

85

86

87

89

91

93

95

97

98

99

100

101

102

103

104

105

106

108

109

110

112

114

115

117

118

119

123

124

125

127

129

130

134

135

136

137

139

140

141

143

144

145

146

147

148

149

150

151

152

153

154

155

156

159

160

161

162

163

164

165

166

168

169

170

171

172

176

177

178

179

180

181

182

183

185

186

187

188

189

190

191

192

193

194

195

196

197

198

199

200

201

202

204

206

208

209

210

211

212

213

214

215

216

218

220

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237

239

240

241

242

243

244

245

246

247

248

249

250

251

252

256

257

258

259

260

261

262

264

265

266

267

268

270

271

272

273

274

275

276

278

279

280

281

282

283

284

285

286

287

288

289

290

291

292

295

296

297

298

299

300

301

302

303

304

305

306

309

311

312

313

315

316

317

318

319

321

322

323

324

325

326

327

328

329

330

331

332

333

335

336

337

338

339

340

341

Preface

This sixth edition of the well-respected text on construction project management represents a significant revision. The intent is to retain the flavor and quality of the classic book while eliminating some of the detail and updating the content. The content is enhanced by the addition of new material introducing some rapidly evolving topics in construction project management. New instructional materials have also been added to each chapter to increase its value in the classroom. A new example project, selected from the building sector, has been incorporated. Finally, this book takes advantage of advances in technology by employing a companion website that contains material that was appended at the end of the book or inserted as oversized figures in previous editions.

Some detail (such as the detailed cost estimate) and some older content, such as that describing the Arrow Diagramming Method for Critical Path representation have been greatly reduced or eliminated. The coverage of other topics has been increased, and new topics have been added. Reference to line-of-balance scheduling, which provides a valuable representation of repetitive projects, has been expanded. An introduction to Building Information Modeling (BIM) and its associated contract basis founded on Integrated Project Delivery (IPD) has been added. Also a section and various references throughout the book have been added to introduce the basics of lean construction.

To support the use of the book in a learning environment, an introductory section for each chapter has been added that includes a bulleted list of learning objectives. At the end of each chapter, a list of key points from the chapter has been provided, together with review questions and problems. To support live delivery of classes, a set of PowerPoint slides has been prepared for each chapter. It is anticipated that these instructional enhancements will enrich the learning experience provided by the book.

To broaden the scope of the sixth edition, a new example project in the form of a commercial building has been added. The bridge example is retained and in many instances is the single example of reference where topics are addressed that represent the building sector as well as the heavy civil sector.

The building example is an actual project, in the form of a single-story office building constructed in 2006–2007 for a technology company engaged in computer programming and consulting. The design and construction information for the building project was graciously provided to the authors for inclusion in this book by the project design team, the contractor, and the owner. A picture of the building, shown on the book cover, was also provided.

A building, by nature, is far more complex than a bridge. Whereas the bridge is primarily composed of structure and earthwork, and can be fully described in a few drawings, a building contains structure and earthwork, but it also contains an envelope to keep the elements out and to enable control of the interior environment. All surfaces in the building, including floors, walls, and ceilings, require finishes. Buildings have openings requiring doors and windows and the associated hardware. They typically have architectural features such as millwork and signage. Moreover, a building contains a number of systems, such as mechanical, plumbing, fire safety, electrical, and low-voltage systems for security and communication. Each of these building elements must be fully designed and represented in graphical models (the drawings). As a result, though the building is relatively small and uncomplicated, the design of our commercial building example project encompasses some 40 pages of drawings. The inclusion of this complete set of drawings is made possible only by linking a companion website to the book. The companion website is accessed through the following URL: www.wiley.com/go/cpm6e.

In addition to the commercial building drawings, a number of other useful items will be found on the companion website. On the website will be found the figures that were large enough in previous editions to require cumbersome fold-out pages. These are referred to as charts in this edition to distinguish them from figures embedded in the text. Providing them in digital format on the companion website is consistent with the industry trend away from paper documentation. Relevant appendix material from previous editions has also been retained on the companion website. Finally, an instructor-only, password accessible location on the website holds an answer key for the end-of-chapter review questions and problems, as well as the PowerPoint presentations.

A new team of authors has taken on the responsibility to develop this sixth edition of Construction Project Management. Jerald L. Rounds and Robert O. Segner, Jr. are honored to have been chosen to continue the excellence of Construction Project Management initiated by Richard H. Clough and continued through many revisions by Glenn A. Sears and more recently by S. Keoki Sears.

Jerald L. Rounds and Robert O. Segner, Jr.

1Construction Practices

1.1 Introduction

The objective of this book is to present and discuss the management of field construction projects. These projects involve a great deal of time and expense, so close management control is required if they are to be completed within the established time and cost constraints. The text also develops and discusses management techniques directed toward the control of cost, time, resources, and project finance during the construction process. Emphasis is placed on practical and applied procedures of proven efficacy. Examples relate to field construction practices.

Effective management of a project also requires a considerable background of general knowledge about the construction industry. The purpose of this chapter is to familiarize the reader with certain fundamentals of construction practice that will be useful for a complete understanding of the discussions presented in later chapters. Learning objectives for this chapter include:

Recognize the size and impact of the construction industry.

Understand how a construction project moves from concept to reality.

Identify entities involved in a construction project and various project delivery systems that link the participating entities.

Introduce the role of the project manager.

1.2 The Construction Industry

In terms of the dollar value of output produced, the construction industry is one of the largest single production activities of the US economy. As of December of 2013, the seasonally adjusted value of construction put in place for 2013 was estimated to be $0.930 trillion. This figure is updated monthly by the US Census Bureau. The current value can be found on the US Census Bureau website under Construction Spending, www.census.gov/construction/c30/c30index.html. The current dollar gross domestic product (GDP) in the fourth quarter of 2013 was $17.103 trillion. This figure is regularly updated by the US Department of Commerce, Bureau of Economic Analysis, and can be found at www.bea.gov/newsreleases/ national/gdp/gdpnewsrelease.htm.

Though construction was severely impacted by the economic downturn at the end of the first decade of this century, the annual expenditure for construction still accounts for almost 5.44 percent of the GDP. More than 1 of every 20 dollars spent for goods and services in the United States is spent on construction. The construction industry is also one of the nation’s largest employers, so its impact in terms of both dollars and jobs remains considerable.

Not only does the construction industry touch the lives of virtually every human being on a daily basis; it also occupies a fundamental position in many national economies. This large and pervasive industry is regarded as the bellwether of economic growth in the United States. Periods of national prosperity usually are associated with high levels of construction activity. One is the natural result of the other.

The construction industry is heterogeneous and enormously complex. There are several major classifications of construction that differ markedly from one another: housing, nonresidential building, heavy civil, utility, and industrial. In addition, these construction types are further divided into many specialties, such as electrical, concrete, excavation, piping, and roofing.

Construction work is accomplished by contractors who vary widely in terms of size and specialty. Some contractors choose to concentrate on a particular task or aspect of the construction project and are therefore referred to as specialty contractors. Others assume broader responsibility for a comprehensive work package and are referred to as general contractors. Commonly, general contractors will subcontract specific aspects of a project to specialty contractors, forming a contractual web of general contractors and specialty contractors. Within the industry, very large contractors handle annual volumes in excess of $15 billion; their annual budgets rival the gross national products of many small countries. However, the construction industry is typified by small businesses.

1.3 The Construction Project

Construction projects are intricate, time-consuming undertakings. The total development of a project normally consists of several phases requiring a diverse range of specialized services. In progressing from initial planning to project completion, the typical job passes through successive and distinct stages that demand input from such disparate areas as financial organizations, governmental agencies, engineers, architects, lawyers, insurance and surety companies, contractors, material and equipment manufacturers and suppliers, and construction craft workers.

During the construction process itself, even a project of modest proportions involves many skills, materials, and literally hundreds of different operations. The assembly process must follow a natural order of events that constitutes a complicated pattern of individual time requirements and restrictive sequential relationships among the project’s many segments.

To a great extent, each construction project is unique—no two jobs are ever exactly the same. In its specifics, each structure is tailored to suit its environment, arranged to perform its own particular function, and designed to reflect personal tastes and preferences. The vagaries of the construction site and the possibilities for creative and utilitarian variation of even the most standardized building product combine to make each construction project a new and different experience. The contractor sets up its “factory” on the site and, to a large extent, custom builds each structure.

Construction is subject to the influence of highly variable and sometimes unpredictable factors. The construction team, which includes architects, engineers, craft workers, specialty contractors, material suppliers, and others, changes from one job to the next. All the complexities inherent in different construction sites—such as subsoil conditions, surface topography, weather, transportation, material supply, utilities and services, local specialty contractors, labor conditions, and available technologies—are an innate part of construction.

However, though construction projects are subject to infinite variety, construction processes tend to be consistent from job to job. Each job goes through mobilization and closeout processes. All materials and installed equipment are subject to a procurement process that includes submittals, approvals, purchase, and shipment to the job site. Contracts are negotiated. Costs are estimated and billed out when a component is completed. Changes happen regularly, but even changes are handled through a consistent change order process. Hence, much of the current focus in construction management is on understanding and managing construction processes more effectively.

The character of construction projects, typified by their complexity and diversity and by the nonstandardized nature of their production, is a result of variable inputs operated on by standard processes yielding a unique product. The use of prefabricated modular units is somewhat limiting this variability, but it is unlikely that field construction will ever be able to adapt completely to the standardized methods and product uniformity of assembly-line production. To the contrary, many manufacturing processes are moving toward mass customization, or “one-off” production and adopting many of the project management tools originating in the construction industry.

1.4 Project Stages

A construction project proceeds in a rather definite order; the stages of development that follow are typical.

A. Planning and Definition

Once an owner has identified the need for a new facility, he or she must define the requirements and delineate the budgetary constraints. Project definition involves establishing broad project characteristics, such as location, performance criteria, size, configuration, layout, equipment, services, and other owner requirements needed to establish the general aspects of the project. Conceptual planning stops short of detailed design, although a considerable amount of preliminary architectural or engineering work may be required. The definition of the work is basically the responsibility of the owner, although a design professional may be called in to provide technical assistance and advice.

B. Design

The design phase involves the architectural and engineering design of the entire project. It culminates in the preparation of final working drawings and specifications for the total construction program. In practice, design, procurement, and construction often overlap, with procurement and construction beginning on certain segments as soon as the design is completed and drawings and specifications become available for those segments.

With the advent of high-speed computing and massive data management capabilities, the various design components can now be incorporated into a single database producing integrated design in a digital format. Production information is being added to the database, resulting in a Building Information Modeling (BIM) model of the project that contains all information on the project in a unique digital format. The use of BIM is still in the early stages, but its use is evolving rapidly throughout the construction industry.

C. Procurement and Construction

Procurement refers to the ordering, expediting, and delivering of key project equipment and materials, especially those that may involve long delivery periods. This function may or may not be handled separately from the construction process itself. Construction is, of course, the process of physically erecting the project and putting the materials and equipment into place, and this involves providing the manpower, construction equipment, materials, supplies, supervision, and management necessary to accomplish the work.

This stage moves toward conclusion with substantial completion of the project when the owner gains beneficial use of the facility. The conclusion of the project occurs when the terms of all contracts are fulfilled and the contracts are closed out. This closeout cycle is often part of a commissioning process that accomplishes many things, including bringing the facility on line, facilitating owner occupancy and turnover of facility operations to the owner, and closing out of all construction contracts. Many contractors follow the final closeout of the project with an internal postproject review from which the contractor gleans a great deal of information that helps to improve company processes and hence to mold the evolution of the company.

1.5 Owner

The owner, whether public or private, is the instigating party that gets the project financed, designed, and built. Public owners are public bodies of some kind and range from the federal government down through state, county, and municipal entities to a multiplicity of local boards, commissions, and authorities. Public projects are paid for by appropriations, bonds, or other forms of financing and are built to perform a defined public function. Public owners must proceed in accordance with applicable statutes and administrative directives pertaining to advertising for bids, bidding procedure, construction contracts, contract administration, and other matters relating to administration of the design and construction process.

Private owners may be individuals, partnerships, corporations, or various combinations thereof. Most private owners have the project built for their own use: business, habitation, or otherwise. However, some private owners do not intend to be the end users of the constructed facility; rather, they plan to sell, lease, or rent the completed structure to others. These end users may or may not be known to the owners at the time of construction.

A third classification of ownership in the form of a public-private partnership (PPP) has become popular. This tends to be subject to the rules and regulations governing public ownership since the partnership is typically used as a means to procure private financing for a public project.

1.6 Architect-Engineer

The architect-engineer, also known as the design professional, is the party or firm that designs the project. Because such design is architectural or engineering in nature, or often a combination of the two, the term architect-engineer is used in this book to refer to the design professional, regardless of the applicable specialty or the relationship between the architect-engineer and the owner.

The architect-engineer can occupy a variety of positions with respect to the owner for whom the design is undertaken. Many public agencies and large corporate owners maintain their own in-house design capability. In such instances, the architect-engineer is the design arm of the owner. In the traditional and most common arrangement, the architect-engineer is a private and independent design firm that accomplishes the design under contract with the owner. Where the design-construct mode of construction is used, the owner contracts with a single party for both design and construction. In such cases, the architect-engineer is a branch of, or is affiliated in some way with, the construction contractor.

1.7 Prime Contractor

A prime contractor, who is typically a general contractor, is a firm that contracts directly with the owner for the construction of a project, either in its entirety or for some designated portion thereof. In this regard, the owner may choose to use a single prime contract or several separate prime contracts.

Under the single-contract system, the owner awards construction of the entire project to one prime contractor. In this situation, the contractor brings together all the diverse elements and inputs of the construction process into a single, coordinated effort and assumes full, centralized responsibility for the delivery of the finished job, constructed in accordance with the contract documents. The prime contractor is fully responsible to the owner for the performance of the subcontractors and other third parties to the construction contract. The prime contractor may choose to self-perform certain parts of the work or may choose to subcontract all of the work to specialty contractors.

When multiple prime contracts are used, the project is not constructed under the centralized control of a single prime contractor. Rather, several independent contractors work on the project simultaneously, and each is responsible for a designated portion of the work. Each of the contractors is under contract with the owner, and each functions independently of the others. Responsibility for coordination of these contractors may be undertaken by the owner, the architect-engineer, a construction manager, or one of the prime contractors who is paid extra to perform certain overall job management duties.

1.8 Competitive Bidding

The owner selects a prime contractor on the basis of competitive bidding, negotiation, or some combination of the two. A large proportion of construction in the United States is done by contractors that obtain their work in bidding competition with other contractors. The competitive bidding of public projects is often required by law and is standard procedure for public agencies. Traditionally, all public construction work has been done by this method, though recently some alternative approaches have been approved. When bidding a project, the contractor estimates how much the project will cost using the architect-engineer’s drawings and specifications as a basis for the calculations. The contractor then adds a reasonable profit to this cost and guarantees to do the entire job for the stated price.

Bid prices quoted by the bidding contractors most often constitute the principal basis for selection of the successful contractor, with the low bidder usually receiving the contract award. Most bidding documents stipulate that the work shall be awarded to the “lowest responsible bidder.” This gives the owner the right to reject the proposal of a bidding contractor if the contractor is judged to be unqualified for some reason. If its bid is selected, the contractor is obligated to complete the work in exchange for the contract amount.

Competitive bidding can also be used where the successful contractor is determined on a basis other than the estimated total cost of the construction. For example, where the contract involves payment of a prescribed fee to the contractor, the amount of the fee is sometimes used as a basis of competition among contractors. Construction management services are sometimes obtained by an owner using the fees proposed by the different bidders as the basis for contract award. This is often referred to as a fee-based bid.

1.9 Negotiated Contracts

At times it can be advantageous for an owner to negotiate a contract for its project with a preselected contractor or small group of contractors. It is common practice for an owner to forgo the competitive bidding process and to handpick a contractor on the basis of its reputation and overall qualifications to do the job. A contract is negotiated between the owner and the chosen contractor. Clearly, such contracts can include any terms and provisions that are mutually agreeable to the parties. Most negotiated contracts are of the cost-plus-fee type, a subject that will be developed more fully later.

1.10 Combined Bidding and Negotiation

An owner sometimes will combine elements of both competitive bidding and negotiation into an approach known as best value. In this approach, a portion of the decision is based on price and the rest on qualifications. In the best-value approach, the competing contractors are required to submit their qualifications along with their bids and are encouraged to tender suggestions as to how the cost of the project could be reduced. Competing contractors are often interviewed, in addition to submitting the bid and the qualifications statement. The owner then scores the bid and the qualifications, awarding the project to the contractor with the best score. The best-value approach is now acceptable in many public-sector environments.

1.11 Subcontracting

The extent to which a general contractor will subcontract work depends greatly on the nature of the project and the contractor’s own organization. There are instances where the job is entirely subcontracted, so the general contractor provides only supervision, job coordination, project billing, and perhaps general site services. At the other end of the spectrum are those projects where the general contractor does no subcontracting, choosing to do the work entirely with its own forces. Customarily, however, the prime contractor will perform the basic project operations and will subcontract the remainder to various specialty contractors. Types of work with which the prime contractor is inexperienced or for which it is not properly equipped are usually subcontracted, since qualified specialty contractors generally are able to perform their specialty faster and less expensively than the general contractor. In addition, many construction specialties have specific licensing, bonding, and insurance requirements that would be costly for the general contractor to secure for intermittent use.

When the prime contractor engages a specialty firm to accomplish a particular portion of the project, the two parties enter into a contract called a subcontract. No contractual relationship is thereby established between the owner and the subcontractor. When a general contractor sublets a portion of its work to a subcontractor, the prime contractor remains responsible under its contract with the owner for any negligent or faulty performance by the subcontractor. The prime contractor assumes complete responsibility to the owner for the direction and accomplishment of the total work. An important part of this responsibility is the coordination and supervision of the various subcontractors.

1.12 Design-Bid-Construct

Traditionally, field construction is not begun until the architect-engineer has completed and finalized the design. This sequence is still predominant in the industry and is referred to as the design-bid-construct procedure. While completing one step before initiating the next may be acceptable to owners on some projects, it will be unacceptably slow to other owners. A number of financial considerations dictate the earliest possible completion date for many construction projects. It is possible to reduce the total design-construction time required for some projects by starting the construction before complete design of the entire project has been accomplished.

1.13 Fast Tracking

Fast tracking refers to the overlapping accomplishment of project design and construction. As the design of progressive phases of the work is finalized, these work packages are put under contract, a process also commonly referred to as phased construction. Early phases of the project are under construction while later stages are still in the design process. This procedure of overlapping the design and construction can appreciably reduce the total time required to achieve project completion. For obvious reasons, fast tracking and phased construction sometimes can offer attractive advantages to the owner and also can be the source of severe coordination problems.

1.14 Construction Contract Services

A myriad of contract forms and types are available to the owner for accomplishing its construction needs, and all of them call for defined services to be provided under contract to the owner. The scope and nature of such services can be made to include almost anything the owner wishes. The selection of the proper contract form appropriate to the situation is an important decision for the owner and is one deserving of careful consideration and consultation.

The construction contract can be made to include construction, design-construct, or construction management services, each of which is discussed in the next three sections.

1.15 Construction Services

A large proportion of construction contracts provide that the general contractor have responsibility to the owner only for accomplishment of the field construction. Under such an arrangement, the contractor is completely removed from the design process and has no input into it. Its obligation to the owner is limited to constructing the project in full accordance with the contract terms.

Where the contractor provides construction services only, the usual arrangement is for a private architect-engineer firm to perform the design in contract with the owner. Under this arrangement, the design professional acts essentially as an independent design contractor during the design phase and as an agent of the owner during construction operations. The architect-engineer acts as a professional intermediary between the owner and contractor and often represents the owner in matters of construction contract administration. Under such contractual arrangements, the owner, architect-engineer, and contractor play narrowly defined roles, and the contractor is basically in an adversarial relationship with the other two.

1.16 Design-Construct

When the owner contracts with a single firm for both design and construction and possibly procurement services, this is referred to as a design-construct project. This form of contract is usually negotiated, although occasionally it is competitively bid. Usually, the contractor has its own design section with architects and engineers as company employees. In other cases, however, the architect-engineer can be a contractor’s corporate affiliate or subsidiary, or the contractor can enter into a joint venture arrangement with an independent architect-engineer firm for a given project or contract.

The team concept is basic to design-construct. The owner, designer, and builder work cooperatively in the total development of the project. The contractor provides substantial input into the design process on matters pertaining to materials, construction methods, cost estimates, and construction time schedules. In recent years, owners have shown increasing acceptance and usage of this concept, largely due to the economies of cost and time that can be realized by melding the two functions of design and construction. Injecting contractor experience and expertise into the design process offers the possibility of achieving cost savings for the owner. Because fast tracking is possible under a design-construct contract, the owner may well have the beneficial use of the structure considerably before it would have under the more traditional design-bid-construct arrangement.

A turnkey contract is similar to a design-construct contract. The difference lies in the greater range of responsibilities that the contractor undertakes on behalf of the owner under a turnkey arrangement. For example, a turnkey contract often includes such services as land selection and acquisition, project financing, project equipage procurement, and leasing of the completed facility.

1.17 Construction Management

The term construction management is applied to the provision of professional management services to the owner of a construction project with the objective of achieving high quality at minimum cost. Such services may encompass only a defined portion of the construction program, such as field construction, or they may include total project responsibility. The objective of this approach is to treat project planning, design, and construction as integrated tasks within a construction system. Where construction management is used, a nonadversarial team is created consisting of the owner, construction manager, architect-engineer, and contractor. The project participants, by working together from project inception to project completion, attempt to serve the owner’s best interests in optimum fashion. By striking a balance between construction cost, project quality, and completion schedule, the management team strives to produce for the owner a project of maximum value within the most economical time frame. Construction management does not include design or construction services per se but involves management direction and control over defined design and construction activities.

Construction management services can be performed for the owner for a stipulated fee by a range of firms, including design firms, contractors, and professional construction managers. Such services range from merely coordinating contractors during the construction phase to broad-scale responsibilities over project planning and design, project organization, design document review, construction scheduling, value engineering, field cost monitoring, and other management services. Selection of the construction manager by the owner is sometimes accomplished by a best-value approach, including both fee and qualifications as bases for contract awards. Usually, however, the construction management arrangement is considered to be a professional services contract and is negotiated. These contracts normally provide for a fixed fee plus reimbursement of management costs.

The Construction Management approach is practiced in two distinct variations. With Agency Construction Management, the construction manager operates throughout the project as the agent of the owner to manage the entire project in the best interest of the owner and does not perform any of the construction work. With Construction Management At Risk, the construction manager will, at some relatively early stage of design, provide cost and schedule commitments to the owner and take on the responsibility of completing the job within the time frame and cost stated. At that point, the project takes on the nature of a negotiated, fixed-sum project.

1.18 Fixed-Sum Contract

A fixed-sum contract requires the contractor to complete a defined package of work in exchange for a sum of money fixed by the contract. Should the actual cost of the work exceed this figure, the contractor absorbs the loss. The owner is obligated to make only such total payment as is stipulated in the con- tractual agreement. A fixed-sum contract may be either lump sum or unit price.

With a lump-sum contract, the contractor agrees to complete a stipulated package of work in exchange for a single lump sum of money. Use of this form of contract is obviously limited to those construction projects where both the nature and quantity of each work type can be accurately and completely determined before the contract sum is set.

A unit-price contract requires the contractor to perform certain well-defined items of work in accordance with a schedule of fixed prices for each unit of work put into place. The total sum of money paid to the contractor for each work item is determined by multiplying the contract unit price by the number of units actually done on the job. The contractor is obligated to perform the quantities of work required in the field at the quoted unit prices, whether the final quantities are greater or less than those initially estimated by the architect-engineer. This is subject to any contract provision for redetermination of unit prices when substantial quantity variations occur. Unit-price contracts are especially useful on projects where the nature of the work is well defined but the quantities of work cannot be accurately forecast in advance of construction.

1.19 Cost-Plus-Fee Contracts

Cost-plus-fee contracts provide that the owner reimburse the contractor for all construction costs and pay a fee for its services. How the contractor’s fee is determined is stipulated in the contract, and a number of different procedures are used in this regard. Commonly used are provisions that the fee shall be a stipulated percentage of the total direct cost of construction or that the fee shall be a fixed sum. Incentive clauses are sometimes included that give the contractor an inducement to complete the job as efficiently and expeditiously as possible through the application of bonus and penalty variations to the contractor’s basic fee. A guaranteed maximum cost is frequently included in cost-plus contracts. Under this form, the contractor agrees that it will construct the total project in full accordance with the contract documents and that the cost to the owner will not exceed some total price.

1.20 Work-by-Force Account

The owner may elect to act as its own constructor rather than have the work done by a professional contractor. If the project is being built for the owner’s own use, this method of construction is called the force-account system. In such a situation, the owner may accomplish the work with its own forces and provide the supervision, materials, and equipment itself. Or the owner may choose to subcontract the entire project, assuming the responsibility of coordinating and supervising the work of the subcontractors. Because public projects generally must be contracted out on a competitive-bid basis, force-account work by a public agency usually is limited to maintenance, repair, or cases of emergency. Force-account work can also be coupled with other contracting methods discussed earlier in this chapter to handle specific aspects of the project that cannot be clearly defined or have undergone significant change. In such cases, the contractor performs the associated work at the direction of the owner and bills for these services on a time and materials basis.

Over the years, many studies have revealed that most owners cannot perform field construction work nearly as well or as inexpensively as professional contractors. The reason for these findings is obvious: The contractor is intimately familiar with materials, equipment, construction labor, and methods. It maintains a force of competent supervisors and workers and is equipped to do the job. Only when the owner conducts a steady and appreciable volume of construction and applies the latest field management techniques is it economically feasible for it to carry out its own construction operations.

1.21 Turnkey and BOT Contracts

Fixed-sum, cost-plus-fee, and work-by-force account contracting methods all require owners to coordinate initial planning, design, construction, and facilities start-up. These tasks distract the owners from their core business responsibilities. For this reason, some owners also contract these responsibilities to the contractor. Turnkey and build-operate-transfer (BOT) contracts provide a vehicle for complete project delivery by the contractor.

In a turnkey arrangement, the owner provides the facility design requirements to the contractor, which designs and constructs the facility under a single contract. The single contract eliminates the need for owner coordination and reduces project duration. Upon completion, the key to the project is turned over to the owner and the contract is closed out.

BOT contracts are an extension of the turnkey method. The contractor designs, constructs, operates, and maintains the facility for a predetermined concessionary period. In most cases, the contractor receives no payment from the owner for these services but retains all or a portion of the revenues earned by the project during the concession. This contracting method generally is used for bridges, highways, power plants, and similar projects that generate a long-term revenue stream. At the end of the concession period, ownership transfers from the contractor to the owner.

1.22 Integrated Project Delivery

A new type of project delivery system is emerging with the development of BIM. As previously indicated, in a BIM environment, all data for the project go into a massive database that is shared by all stakeholders in the project. Because the data are integrated into a single entity, all stakeholders who contribute and use the data become active participants in the entire project. The result is shared risk and shared reward across all stakeholders, which, in turn, requires a new type of contract that integrates all stakeholders into a single operational structure. Individual contracts between various stakeholders are no longer efficient in a BIM environment.

Integrated Project Delivery (IPD) ties all stakeholders together based on a single contract that is signed by each stakeholder. This includes the owner, designer, contractors, and subcontractors. Such an arrangement of shared data, shared risk, and shared reward imposes the requirement upon the project of an efficient team approach. All succeed together, or all fail together. Though BIM and IPD are just emerging, as they evolve, they portend dramatic changes to the management of construction projects.

1.23 Speculative Construction

When owners build structures for sale or lease to other parties, they engage in what is commonly referred to as speculative construction. Housing and commercial properties like shopping centers and warehousing facilities are common examples of such construction. In tract housing, for instance, “merchant” builders develop land and build housing for sale to the general public. This is a form of speculative construction through which developers act as their own prime contractors. They build dwelling units on their own account and employ sales forces to market their products. In much speculative housing, contractors build for unknown buyers. In commercial applications, however, construction does not normally proceed until suitable sale or lease arrangements have been made. Leases are usually necessary so that the developers can arrange their financing. Leases also enable them to build to the lessee’s individual specifications. Most speculative builders function more as land or commercial developers than as contractors, choosing to subcontract all or most of the actual construction work.

1.24 Management during the Design Phase

Project cost and time control actually begin very early in the project with the project owner’s developing basic cost and time requirements necessary to justify the project. The design team respects the owner’s limits, constraining the design, as it evolves, to meet the owner’s cost and time boundaries. In the initial design stages, estimates such as annual cost to the owner and total life-cycle costs of the facility are made. Technical job standards are weighed against cost, function, maintenance, and appearance with the objective of minimizing the full cost of constructing, operating, and maintaining the new facilities over their useful life. As the design develops, construction methods and material alternatives are subjected to value analysis as a rational means of optimizing the entire construction process in terms of cost and time. Cost budgets—ranging from preliminary to final—are prepared as the design approaches completion.

Time control during the design stage is directed toward minimizing construction time consistent with project quality, safety, and cost. The delivery times of materials and project equipment are checked. Where long delivery periods are involved, the design is changed or procurement is initiated as soon as the design has progressed sufficiently to allow detailed purchasing specifications to be drawn. Construction methods are chosen whose cost characteristics are favorable and for which adequate labor and construction equipment will be available as needed. A preliminary project time schedule usually is prepared as the design progresses.

1.25 Management of Field Construction

Discussions up to this point have demonstrated that owners have the option of using many different project delivery systems to get their projects built. Regardless of the variability of these systems, however, one party assumes management responsibility for the field construction process. Depending on the methods used by the owner, this party may be the owner, the architect-engineer, a construction manager, or a general contractor.

The management of field construction customarily is done on an individual project basis, with a project manager being made responsible for all aspects of the construction. For large projects, a field office usually is established directly on the job site for the use of the project manager and staff. A good working relationship with a variety of outside persons and organizations, such as architects, engineers, owners, subcontractors, material and equipment suppliers, labor unions, and regulatory agencies, is an important part of guiding a job through to its conclusion. Field project management is directed toward pulling together all the diverse elements necessary to complete the project satisfactorily. Management procedures presented later will, in general, be discussed only as they apply to field construction, although they are equally applicable to the entire project, from concept to commissioning.

1.26 Project Manager

The project manager organizes, plans, schedules, and controls all the work of the project and is responsible for getting the project completed within the time and cost limitations. The project manager acts as the focal point for all facets of the project and brings together the efforts of all organizations contributing to the construction process. He coordinates matters relevant to the project and expedites project operations by dealing directly with the individuals and organizations involved. In any such situation where events progress rapidly and decisions must be consistent and informed, the specific leadership of one person is needed. Because the project manager has the overall responsibility, this person must have broad authority over all elements of the project. The nature of construction is such that the manager often must take action quickly on his own initiative, and it is necessary that he be empowered to do so. To be effective, he must have full control of the job and be the one voice that speaks for the project. Project management is a function of executive leadership and provides the cohesive force that binds together the several diverse elements into a team effort for project completion.

Though a single project manager is recognized for overall responsibility for a project, there are, in reality, numerous project managers involved in most projects. Generally, each entity will have its own project manager, designated to be the top person within the context of that entity that is responsible for the successful completion of its portion of the project. Thus, in addition to the general contractor, each specialty contractor will have a designated project manager for its portion of the project. The architect-engineer will have a designated person responsible for successful completion of the design of the project, and the owner will also have a designated owner’s project manager. Though the focus of this text is the general contractor’s project manager, the techniques and procedures presented are equally applicable to each of the project managers working throughout the project.