Provides a guide to the general principles of Scottish law relevant to construction contracts and the main provisions of the standard forms of construction contract used in Scotland including:

  • the obligations of employers and contractors
  • certification
  • payment
  • ending a construction contract
  • remedies
  • subcontracts
  • collateral warranties
  • insurance
  • dispute resolution
  • regulatory matters

The new edition has been substantially updated and expanded to take account of the latest editions of the Scottish Standard Building Contracts and recent case law. Specific updates have been driven by the following changes to legislation and standard contracts

  • Local Democracy Economic Development and Construction Act 2009 and the relative Scheme for Construction Contracts
  • Arbitration (Scotland) Act 2010
  • Recognising the significant increase in use of NEC3 standard forms of contract, references to NEC3 provisions have been introduced throughout the relevant chapters so that each now covers the common law, the SBCC provisions and the NEC3 provisions.

It also features new chapters on: litigation; competition; the Bribery Act 2010; and guarantees and bonds.

From reviews of previous editions:

  • ‘very approachable and readable… I would particularly recommend this book to non-legal construction professionals’ – Construction & Engineering Law
  • ‘an informative textbook for the practitioner… [a] significant contribution to knowledge’ – Arbitration
  • ‘a highly competent… textbook which would be of value for industry professionals with no legal background’ – Construction Law

Sie lesen das E-Book in den Legimi-Apps auf:

Android
iOS
von Legimi
zertifizierten E-Readern

Seitenzahl: 1467

Veröffentlichungsjahr: 2014

Bewertungen
0,0
0
0
0
0
0
Mehr Informationen
Mehr Informationen
Legimi prüft nicht, ob Rezensionen von Nutzern stammen, die den betreffenden Titel tatsächlich gekauft oder gelesen/gehört haben. Wir entfernen aber gefälschte Rezensionen.



Table of Contents

Title Page

Copyright

Dedication

Foreword

Preface

Chapter 1: Construction Contracts in General

1.1 Introduction

1.2 Definition of a construction contract

1.3 Parties involved in a construction project

1.4 Types of construction contract

1.5 The SBCC forms of building contract

1.6 The NEC3 forms of contract

1.7 Building Information Modelling (BIM)

1.8 Soft Landings

Chapter 2: Procurement

2.1 Introduction

2.2 The EU public procurement regime and EU economic and legal principles

2.3 Beyond the EU

2.4 Conditions for application of the procurement rules

2.5 Who must comply with the Regulations?

2.6 Treatment of a proposed contract as a works contract, supply contract or a services contract

2.7 What are the relevant financial thresholds?

2.8 Is there an applicable exclusion?

2.9 Types of procurement procedure

2.10 The open procedure

2.11 The restricted procedure

2.12 The negotiated procedure with advertisement

2.13 The competitive dialogue procedure

2.14 Awarding the contract

2.15 The

Alcatel

mandatory standstill period

2.16 The use of framework agreements in public procurement

2.17 Remedies against contracting authorities (bidder grievances and complaints)

2.18 Awarding low-value contracts fairly

2.19 Forthcoming changes in the Procurement law landscape

Chapter 3: Entering into a Construction Contract

3.1 Introduction

3.2 Essentials of written and oral contracts

3.3 Capacity to contract

3.4 Implied terms

3.5 Letters of intent

3.6 Incorporation of terms by reference to another document

3.7 Contract interpretation

3.8 Signing a building contract

Chapter 4: Employers' Obligations

4.1 Introduction

4.2 Possession of the site

4.3 Administration

4.4 Information and instructions

4.5 Variations

4.6 Other obligations

Chapter 5: Contractors' Obligations

5.1 Introduction

5.2 Completing the works

5.3 The quality of the work

5.4 Defective work

5.5 Progress of the works

5.6 Insurance and indemnity

5.7 The Joint Fire Code

5.8 Health and safety

Chapter 6: Time

6.1 Introduction

6.2 Commencement of the works

6.3 Time of the essence

6.4 Progress of the works

6.5 Adjustment of the Completion Date and extension of time for completion

6.6 Partial possession, sectional completion and acceleration

6.7 Completion of the works

6.8 Damages for late completion

6.9 Liquidated damages

6.10 The SBC/DB

6.11 The NEC3

Chapter 7: Certification

7.1 Introduction

7.2 Formal requirements of certificates

7.3 Interim certificates

7.4 Final certificates

7.5 Other certificates

7.6 Roles and duties of certifiers

Chapter 8: Payment

8.1 Contractual payment

8.2 Adjustment of the contract price

8.3 Loss and expense

8.4 Quantum meruit

8.5 Quantum lucratus

8.6 Contractual retention

8.7 Project bank accounts (PBA)

Chapter 9: Ending a Construction Contract

9.1 Introduction

9.2 Frustration and impossibility

9.3 Force majeure

9.4 Termination

9.5 Repudiation and rescission

9.6 Death and illness

9.7 Illegality

9.8 Insolvency

9.9 Prescription

Chapter 10: Remedies

10.1 Introduction

10.2 Rescission

10.3 Specific implement

10.4 Damages for breach of contract

10.5 Finance charges

10.6 Interest

10.7 Interdict

10.8 Withholding payment

10.9 Suspending performance

10.10 Delictual claims

Chapter 11: Sub-contractors and Suppliers

11.1 Introduction

11.2 SBCC Standard Sub-Contracts

11.3 NEC3 Standard Sub-Contracts

11.4 Nominated and domestic sub-contractors

11.5 Named and specialist Sub-Contractors

11.6 Direct payments to sub-contractors

11.7 Privity of contract

11.8 Relationship between main and sub-contracts

11.9 Restrictions on sub-contracting

11.10 Main contractor's discount

11.11 Suppliers

11.12 Retention of title clauses

11.13 Supply of goods by sub-contractors

11.14 Adequate mechanism for payment

Chapter 12: Assignation, Delegation and Novation

12.1 Introduction

12.2 Common law

12.3 Effect of assignation upon claims

12.4 Delectus personae

12.5 Assignation under the SBC and the SBC/DB

12.6 Assignation under the NEC3

12.7 Delegation

12.8 Novation

Chapter 13: Rights for Third Parties

13.1 General

13.2 Collateral warranties

13.3 Typical clauses

13.4 Effects of the 1996 Act on collateral warranties

13.5 Third party rights schedule

13.6 Assignation

Chapter 14: Insurance

14.1 Insurance: General principles

14.2 Insurance under the SBC and the SBC/DB

14.3 Insurance under the NEC3

14.4 Professional indemnity insurance

14.5 Latent defects insurance

14.6 Project insurance

Chapter 15: Litigation

15.1 Introduction

15.2 The litigation process

Chapter 16: Adjudication

16.1 Introduction

16.2 The scope of Part II of the 1996 Act, as amended by the 2009 Act

16.3 The notice of adjudication

16.4 Appointment of the adjudicator

16.5 The referral notice

16.6 Conduct of the adjudication

16.7 The decision

16.8 Adjudicator's fees and costs/expenses of the parties

16.9 Liability of the adjudicator

16.10 Enforcement proceedings

16.11 Proceedings following adjudication

16.12 Human rights

16.13 Adjudication in PPP contracts

Chapter 17: Arbitration

17.1 Introduction

17.2 The Arbitration (Scotland) Act 2010

Chapter 18: Other Forms of Dispute Resolution

18.1 Mediation

18.2 Settlement agreements

18.3 Expert determination

18.4 Early neutral evaluation

18.5 Senior management review

18.6 Dispute boards

Chapter 19: Tax

19.1 Value Added Tax (VAT)

19.2 The Construction Industry Scheme

Chapter 20: Health and Safety

20.1 Introduction

20.2 Common law

20.3 Health and Safety at Work etc. Act 1974

20.4 The Construction (Design and Management) Regulations 2007

20.5 The SBC and the SBC/DB provisions

20.6 The NEC3 provisions

Chapter 21: Regulatory Matters: Competition in Construction

21.1 Competition law in the UK: Introduction

21.2 Competition law: Overview

21.3 Penalties

21.4 The Chapter I prohibition

21.5 The Roofing and English Construction cases

21.6 The cartel offence

21.7 Leniency

21.8 The Chapter II prohibition

21.9 Summary

Chapter 22: Regulatory Matters: The Bribery Act 2010

22.1 Compliance: The Bribery Act 2010

22.2 The Bribery Act 2010: The offences

22.3 The Bribery Act 2010: The defence

22.4 Facilitation payments

22.5 Consequences of offences under the Bribery Act

22.6 Prosecution under the Bribery Act

22.7 Construction industry risk profile

22.8 The SBC, the SBC/DB, the NEC3 and the Bribery Act

Chapter 23: Guarantees and Bonds

23.1 Guarantees

23.2 Bonds

Tables of Cases

Table of Statutes

Table of Statutory Instruments

Table of References

JCT Standard Form of Building Contract (2011 Edition) and the Standard Building Contract with Quantities for Use in Scotland SBC/Q/Scot (Revised November 2011)

Table of References to the Design and Build Contract for Use in Scotland, DB/Scot 2011 (Revised November 2011)

Table of References to the NEC3 Engineering and Construction Contract (Revised September 2011)

Index

Also of interest

End User License Agreement

Pages

xiii

xiv

xv

xvi

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

181

182

183

184

185

186

187

188

189

190

191

192

193

194

195

196

197

198

199

200

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220

221

222

223

224

225

226

227

228

229

230

231

232

233

234

235

236

237

238

239

240

241

242

243

244

245

246

247

248

249

250

251

252

253

254

255

256

257

258

259

260

261

262

263

264

265

266

267

268

269

270

271

272

273

274

275

276

277

278

279

280

281

282

283

284

285

286

287

288

289

290

291

292

293

294

295

296

297

298

299

300

301

302

303

304

305

306

307

308

309

310

311

312

313

314

315

316

317

318

319

320

321

322

323

324

325

326

327

328

329

330

331

332

333

334

335

336

337

338

339

340

341

342

343

344

345

346

347

348

349

350

351

352

353

354

355

356

357

358

359

360

361

362

363

364

365

366

367

368

369

370

371

372

373

374

375

376

377

378

379

380

381

382

383

384

385

386

387

388

389

390

391

392

393

394

395

396

397

398

399

400

401

402

403

404

405

406

407

408

409

410

411

412

413

414

415

416

417

418

419

420

421

422

423

424

425

426

427

428

429

430

431

432

433

434

435

436

437

438

439

440

441

442

443

444

445

446

447

448

449

450

451

452

453

454

455

456

457

458

459

460

461

462

463

464

465

466

467

468

469

470

471

472

473

474

475

476

477

478

479

480

481

482

483

484

485

486

487

488

489

490

491

492

493

494

495

496

497

498

499

500

501

502

503

504

505

506

507

508

509

510

511

512

513

514

515

516

517

518

519

520

521

522

523

524

525

526

527

528

529

530

531

532

533

534

535

536

537

538

539

540

541

542

543

544

545

546

547

548

549

550

551

552

553

554

555

556

557

558

Guide

Cover

Table of Contents

Foreword

Preface

Begin Reading

List of Illustrations

Figure 5.1

Figure 8.1

Figure 8.2

Figure 8.3

Figure 8.4

Figure 8.5

List of Tables

Table 17.1

Table 17.2

MacRoberts on Scottish Construction Contracts

Third Edition

MacRoberts

Solicitors

Foreword by

The Rt Hon Lord Hope of Craighead

This edition first published 2015

© 2015 by John Wiley & Sons, Ltd

Registered office

John Wiley & Sons, Ltd, The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom.

Editorial offices:

9600 Garsington Road, Oxford, OX4 2DQ, United Kingdom.

The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom.

For details of our global editorial offices, for customer services and for information about how to apply for permission to reuse the copyright material in this book please see our website at www.wiley.com/wiley-blackwell.

The right of the author to be identified as the author of this work has been asserted in accordance with the UK Copyright, Designs and Patents Act 1988.

All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior permission of the publisher.

Designations used by companies to distinguish their products are often claimed as trademarks. All brand names and product names used in this book are trade names, service marks, trademarks or registered trademarks of their respective owners. The publisher is not associated with any product or vendor mentioned in this book.

Limit of Liability/Disclaimer of Warranty: While the publisher and author(s) have used their best efforts in preparing this book, they make no representations or warranties with respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. It is sold on the understanding that the publisher is not engaged in rendering professional services and neither the publisher nor the author shall be liable for damages arising herefrom. If professional advice or other expert assistance is required, the services of a competent professional should be sought.

Library of Congress Cataloging-in-Publication Data

MacRoberts on Scottish building contracts

MacRoberts on Scottish construction contracts / MacRoberts Solicitors;

foreword by The Rt Hon Lord Hope of Craighead, KT.—Third edition.

pages cm

Includes bibliographical references and index.

ISBN 978-1-118-27345-6 (hardback)

1. Construction contracts— Scotland. I. MacRoberts (Firm), author. II. Title.

KDC501.M33 2014

343.41107′8624— dc23

2014016562

A catalogue record for this book is available from the British Library.

Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books.

Cover images: iStockphoto © blackjake, iStockphoto © Martin McCarthy

Cover design by Jeffrey Goh

To David Henderson – without whom this book would never have seen the light of day. We are forever in his debt.

Foreword

The Rt Hon Lord Hope of Craighead KT

A textbook of this kind, which seeks to serve the day-to-day needs of those who enter into and have to administer significant contractual relationships, must keep itself up to date if it is to do its work properly. This is no easy task, especially in a field such as that occupied by contracts entered into in the Scottish construction industry. There are many factors at work which promote changes in law and practice in this area. The standard forms are subject to constant revision to react to the demands of the marketplace. There are changes in the legislation, as it seeks to promote best practice in the industry, to react to the requirements of modern competition law and to combat the increasing menace of bribery. There is also a steady stream of case law, as the limits of existing rules and principles are constantly being tested to resolve the disputes that come before the courts. It was for this reason that I said in my Foreword to the first edition that I hoped that it might be possible for this book, like the forms, to be kept up to date by the issuing of revised editions at appropriate intervals. That indeed is what has happened and, as I welcome this third edition, I have not been disappointed.

As one would expect, the editors have been careful to take account of all these changes. But this has not just been a mechanical exercise. Several important editorial initiatives have been taken to keep pace with changes in practice. At the time of the first edition the standard forms that were most commonly used in the industry in Scotland were those published by the Scottish Building Contracts Committee (the SBCC). As was to be expected, the focus in that edition was on those standard forms. But the New Engineering (NEC3) forms of contract have grown in popularity throughout the United Kingdom, especially in the public sector. So it made sense for them to be given equal consideration in this new edition together with the SBCC forms. Also the focus in previous editions was on the With Quantities version of the Scottish Building Contract which was the version that was most frequently used at that time. This edition has broadened its outlook by including an analysis of important differences between that version and the Design and Build form of contract. This is to be welcomed, as design and build is being increasingly used as the preferred method of procurement in major projects. Chapter 1 also has an extended commentary on professional consultants, who have an increasing role in projects of that kind.

Chapter 17 on arbitration has been rewritten to provide a detailed commentary on the Arbitration (Scotland) Act 2010, and two new chapters have been added. One (Chapter 21) deals with the increasingly important matter of competition law in the context of the construction industry, to which the Office of Fair Trading is now paying close attention. It is plain from its enforcement activities that contractors and those engaged in the supply chain need to be aware of the rules and to conduct their own activities accordingly. The other (Chapter 22) deals with the far-reaching measures introduced by the Bribery Act 2010, which are of concern to everyone engaged in the construction industry both domestically and internationally. As the editors point out, the construction industry is one of the sectors which is likely to be the focus of investigating authorities because of the complex framework of contracts that it routinely uses and the cross-border and international nature of its activities. The penalties for those found guilty of offences are severe. This chapter is essential reading for those in positions of responsibility throughout the industry.

There is more than a hint of unfinished business. At the end of the chapter on procurement we are told that this area of the law is currently undergoing significant transformation as new Public Procurement Directives were adopted by the European Parliament in January 2014 and a Procurement Reform (Scotland) Bill, which will enable Scottish Ministers to make regulations as to the assessment of bidder suitability to tender for public contracts, has been introduced into the Scottish Parliament. The Courts Reform (Scotland) Bill, which will set out the framework for the implementation of the programme of reform of the Scottish Civil Justice system recommended in Lord Gill's Report, is currently passing through the Parliament also. So there are important changes on the way with which this edition cannot deal. Then there is the problem that has been created by differences in approach between the English and the Scottish Courts regarding the question whether a contractor is entitled to an extension of time where there are concurrent causes of delay. The editors express a clear preference for Lord Carloway's impressive dissenting judgment in the Inner House in the City Inn case, which is in harmony with the English approach. It would not be in the least surprising if the UK Supreme Court, by which the issue must surely now be resolved as soon as possible, were to agree with them.

The editors are, of course, entitled to a well-earned rest from their labours. Users of the book will no doubt hope that a fourth edition will be forthcoming before too long, so that it will continue to serve so well the needs of busy practitioners. For the time, however, they will be grateful for the practical approach that it takes to the many issues with which it deals, the broader coverage that it gives to the forms of contract and for the clear and accessible way that its guidance is presented.

David Hope

Preface

In the Preface to the second edition of this book published in 2007, we remarked upon the significant changes in the landscape of construction contracts since the first edition published eight years earlier. Predictably, exactly the same can be said about this third edition. It is, however, not only the law of construction contracts which continues to spin down Tennyson's ringing grooves of change, but also the practice of the users of such contracts. While the previous editions focussed on the SBCC With Quantities and Design and Build standard forms of building contract, the third edition gives equal prominence to the NEC3 Engineering and Construction Contract, an editorial decision made somewhat inevitable by the increasing use in Scotland of that contract. Perhaps not so inevitable was the decision to change the title of the book from MacRoberts on Scottish Building Contracts to MacRoberts on Scottish Construction Contracts, but we think that the latter reflects what has become the more commonly used terminology.

We are indebted to Lord Hope of Craighead for providing, as he did for the first edition, the Foreword. In that Foreword, he mentions a number of the other changes which have demanded substantial revisions to the relevant chapters, most notably to take account of the long-awaited (and welcome) Arbitration (Scotland) Act 2010 and the significant amendments to Part II of the Housing Grants, Construction and Regeneration Act 1996. Completely new chapters dealing with competition law and the Bribery Act illustrate the increasing impact on construction law of the expanding regulatory environment.

It is also interesting to note that while (as pointed out in the last edition) there remains a close relationship between the law of Scotland and that of England, the courts of the respective jurisdictions do not always reach the same result on the same point, as demonstrated by the schism between the ‘English approach’ and the ‘Scottish approach’ following the decision of the Scottish court in City Inn v Shepherd Construction (see Chapter 6).

In addition to those of the editors, individual contributions have been provided by our colleagues: David Arnott, Richard Barrie, Neil Kelly, Duncan Osler, Robin Fallas, Sarah Pengelly, Madeleine Young, David Wilson, Alison Horner, Julie Hamilton, Jennifer McKay, Ainsley MacLaren, Colette McGinley, John Reid, David Flint and Valerie Surgenor, and our now former colleagues Alexandra Lavery and Gavin Thomson. Alan McAdams, yet again, has provided invaluable support to many, if not all, of the contributors, and Jennifer Burns, Kate Moffett and Magdalena Urbanowska played an invaluable role in preparing tables and checking drafts.

Finally, our thanks to Paul Sayer and all of his colleagues at Wiley for their patience and support.

We have endeavoured to state the law as at 1 July 2014.

David HendersonCraig TurnbullShona FrameMacRoberts LLP60 York StreetGlasgow

Chapter 1Construction Contracts in General

1.1 Introduction

Numerous books have been written on the subject of construction contracts. However, many of those are of a specialist nature and most are written from the perspective of English law. The aim of this book is to provide a practical guide to construction contracts governed by the law of Scotland.

There is no doubt that the construction industry not only in Scotland, but throughout the UK, is currently being presented with continuing challenges of an almost unprecedented nature. In the first quarter of 2013, the construction industry suffered a contraction of 2.5% compared with the same period in the previous year, despite a growth in overall Scottish gross domestic product (GDP) of 1.2%. While some major public sector infrastructure projects have lessened the impact of the economic downturn on the Scottish construction sector, the lack of external funding has been a major factor in the sharp reduction in the number of new private commercial development projects.

However, the very size of the construction industry means that it is of huge significance to the economy. According to figures contained in the report by Construction Scotland, Building for the Future: The Scottish Construction Industry's Strategy, 2013–2016, the construction industry generates £27.4 billion (GDP) to the Scottish economy every year, contributing 10% of Scotland's total economic output, and 170,000 people work in construction in Scotland, around 10% of the total Scottish jobs.

1.2 Definition of a construction contract

1.2.1 General

The definition of a construction contract is not straightforward. The construction industry encompasses building and engineering projects which differ enormously in nature, size and complexity. The terms ‘building contract’ and ‘construction contract’ are often used interchangeably. The term ‘construction contract’ was given a statutory meaning for the first time by section 104 of the Housing Grants, Construction and Regeneration Act 1996 (‘the 1996 Act’) and the breadth of the definition illustrates the wide-ranging nature of construction contracts. The 1996 Act has been amended by the Local Democracy, Economic Development and Construction Act 2009 in relation to contracts entered into in England and Wales from 1 October 2011 and in Scotland from 1 November 2011. One of the key amendments was the repeal of the requirement that a construction contract for the purposes of the 1996 Act must be in writing. The following sections summarize the principal requirements of the statutory definition of ‘construction contract’. However, it is important to bear in mind that this statutory definition is relevant only for the purposes of the 1996 Act and for determining whether the provisions of Part II the 1996 Act, such as adjudication and payment requirements, will apply to a particular contract. The fact that a contract is not a ‘construction contract’ for the purposes of the 1996 Act does not mean that it may not be a construction contract in the commonly understood sense of the term, and indeed some contracts falling with the statutory definition, such as for architectural services, would not be described as a construction contract in everyday terms. An English court has recently held that a collateral warranty may, depending on its terms, be a construction contract for the purposes of the 1996 Act and thus subject to the statutory adjudication provisions, see Parkwood Leisure Ltd v. Laing O'Rourke Wales and West Ltd (2013) and the discussion of this case in Section 13.4. The 1996 Act has no relevance in determining whether a contract exists in the first place since this will be determined by a matter of law and evidence; putting it at its simplest, whether there was sufficient consensus as to the essential terms and sufficient proof of such consensus.

It should also be noted that the Scottish Government's legislative programme for 2013–2014 includes the Conclusion of Contracts, etc. Bill, which is intended to allow contracts to be concluded by email and to provide a simpler process for formal execution (signing) of contracts.

1.2.2 Construction contracts under the 1996 Act

Part II of the 1996 Act applies to ‘construction contracts’, being agreements in relation to ‘construction operations’. These terms are defined respectively by sections 104 and 105.

Section 104 provides as follows:

In this Part a ‘construction contract’ means an agreement with a person for any of the following

the carrying out of construction operations;

arranging for the carrying out of construction operations by others, whether under sub-contract to him or otherwise;

providing his own labour, or the labour of others, for the carrying out of construction operations

.

References in this Part to a construction contract include an agreement

to do architectural, design or surveying work, or

to provide advice on building, engineering, interior or exterior decoration or on the laying-out of landscape, in relation to construction operations

.

References in this Part to a construction contract do not include a contract of employment (within the meaning of the Employment Rights Act 1996)

.

The Secretary of State may by order add to, amend or repeal any of the provisions of subsection (1), (2) or (3) as to the agreements which are construction contracts for the purposes of this Part or are to be taken or not to be taken as included in references to such contracts …

It will be noted that the 1996 Act applies to matters beyond the carrying out of building works. It applies to architectural, design and surveying works and to advising on building, engineering, interior or exterior decoration or on the laying-out of landscape in relation to construction operations.

The definition of ‘construction operations’ is central to Part II. This term is defined by section 105(1) which provides as follows:

In this Part ‘construction operations’ means, subject as follows, operations of any of the following descriptions

construction, alteration, repair, maintenance, extension, demolition or dismantling of buildings, or structures forming, or to form, part of the land (whether permanent or not);

construction, alteration, repair, maintenance, extension, demolition or dismantling of any works forming, or to form, part of the land, including (without prejudice to the foregoing) walls, roadworks, power-lines, electronic communications apparatus, aircraft runways, docks and harbours, railways, inland waterways, pipe-lines, reservoirs, water-mains, wells, sewers, industrial plant and installations for purposes of land drainage, coast protection or defence;

installation in any building or structure of fittings forming part of the land, including (without prejudice to the foregoing) systems of heating, lighting, air-conditioning, ventilation, power supply, drainage, sanitation, water supply or fire protection, or security or communications systems;

external or internal cleaning of buildings and structures, so far as carried out in the course of their construction, alteration, repair, extension or restoration;

operations which form an integral part of, or are preparatory to, or are for rendering complete, such operations as are previously described in this subsection, including site clearance, earthmoving, excavation, tunnelling and boring, laying of foundations, erection, maintenance or dismantling of scaffolding, site restoration, landscaping and the provision of roadways and other access works;

painting or decorating the internal or external surfaces of any building or structure

.

Section 105(2) details a number of operations that are not construction operations for the purposes of Part II. The exceptions relate to oil and gas and mining, both underground and opencast; certain specified operations on a site where the primary purpose is nuclear processing, power generation, water or effluent treatment or the production, transmission, processing or bulk storage (other than warehousing) of chemicals, pharmaceuticals, oil, gas, steel or food and drink; the manufacture or delivery to site of components or equipment where the contract does not also provide for their installation; and the making, installation and repair of wholly artistic works. The scope of excluded operations insofar as applicable to works at power stations was considered in the case of North Midland Construction plc v. AE & E Lentjes UK Ltd (2009).

1.2.3 Excluded contracts

Section 106 provides that contracts with residential occupiers are excluded from the operation of Part II of the 1996 Act, as is any other description of construction contract excluded by order of the Secretary of State (or in Scotland, the Scottish Ministers).

A construction contract with a residential occupier is one which principally relates to operations on a dwelling which one of the parties to the contract occupies, or intends to occupy, as his residence.

The term ‘dwelling’ means a dwelling-house or a flat; and for s.106(2) ‘dwelling-house’ does not include a building containing a flat and ‘flat’ means separate and self-contained premises constructed or adapted for use for residential purposes and forming part of a building from some other part of which the premises are divided horizontally. In itself, section 106 is self-explanatory. However, it should be noted that a residential occupier cannot be a limited company for the purposes of this section, see Absolute Rentals Ltd v. Gencor Enterprises Ltd (2001).

The Construction Contracts (Scotland) Exclusion Order 1998 (‘the 1998 Order’) came into force with Part II of the 1996 Act on 1 May 1998. This excluded from the scope of Part II of the 1996 Act project agreements under the Private Finance Initiative (PFI) (provided certain criteria were met) but not sub-contracts such as the construction contract and facilities management or operation and maintenance contract. One of the amendments to the 1996 Act referred to in section 1.2.1 above was the introduction of section 110(1A) which prohibits payment provisions in construction contracts which are conditional on the performance of obligations under another contract or a decision by any person as to whether obligations under another contract have been performed. To avoid this prohibition applying to first-tier sub-contracts under PFI projects and thus prohibiting what are commonly known as ‘equivalent project relief’ clauses in such sub-contracts, the Construction Contracts (Scotland) Exclusion Order 2011 excludes from the operation of section 110(1A) a construction contract if it is a contract pursuant to which a party to a relevant contract (i.e. excluded by the 1998 Order) has subcontracted obligations under that contract to carry out construction operations.

Certain development agreements are also excluded from the operation of Part II under article 6 of the 1998 Order. A contract is a development agreement if it includes provision for the grant or disposal of a relevant interest in the land on which take place the principal construction operations to which the contract relates.

A relevant interest in land means either ownership or a tenant's interest under a lease for a period which is to expire not earlier than 12 months after the completion of the construction operations under the contract.

In Captiva Estates Ltd v. Rybarn Ltd (In Administration) (2006), Captiva entered into a contract with Rybarn to construct 28 flats. Captiva owned the land on which the development was to take place. The contract provided that, as consideration for the works, Captiva would pay Rybarn and would also grant to Rybarn an option to purchase leases in respect of 7 of the 28 flats. The question arose as to whether the contract was a development agreement within the meaning of the English equivalent to the 1998 Order. The court held that the definition of a ‘development agreement’ in the 1998 Order is wide and the contract was caught by it.

1.2.4 Agreements in writing

Section 107 of the 1996 Act as originally enacted provided that Part II only applied to agreements in writing or evidenced in writing or recorded by one of the parties or a third party who has been duly authorized to do so. However, this was repealed with effect from 1 October 2011 in England and 1 November 2011 in Scotland, which means that oral contracts may now be subject to Part II of the 1996 Act. This does not, however, avoid the practical difficulty of proving the terms, or even the existence, of an oral contract in the first place.

1.3 Parties involved in a construction project

The parties involved in a building project can vary considerably depending on the nature and complexity of the project. At one end of the scale, a private individual may engage a joiner, electrician or builder to carry out work to his home. In such an instance, the employment of anyone other than the tradesman or builder may not be necessary. At the other end of the scale, major projects, such as the construction of public buildings, motorways, hotels or power stations, can involve a considerable number of parties from different professional and non-professional disciplines. It is therefore crucial to identify, particularly in a large project, the parties involved in that project, the terms of their respective appointments, the scope of each individual's involvement, and their roles within the project. The following parties are commonly involved in building projects:

1.3.1 Employer and consultants

The term ‘employer’ is used throughout this book as meaning the party for whose benefit the building works are being carried out. This is the term generally used in the standard form building contracts and associated documentation. Other terms such as ‘the owner’, ‘the client’ or ‘the authority’ are also sometimes used. The employer usually assembles the advisory team, though there is no obligation to do so (see obligations of employers in Chapter 4) and smaller projects often do not require the involvement of anyone other than the employer and the contractor. The nature of the team varies depending upon the nature of the project and the choice of procurement method. In the case of a large project, the team may consist of an architect, civil and structural engineer, mechanical and electrical engineer, quantity surveyor, construction design and management (CDM) co-ordinator, one or more specialist consultants depending on the nature of the project, such as environmental consultant, acoustic consultant, etc., and possibly a project manager, a clerk of works and a BIM information manager (see Section 1.7). The team will also vary depending on the procurement method chosen, e.g. design and build, and may also be transferred at a later stage, at least in part, to the contractor in the case of novation (see Section 12.7). The terms of appointment of each member of the team are very important and must ensure that each member's obligations are clearly defined. Where this is not done, difficulties can arise with unnecessary overlap of work or, more importantly, in crucial issues failing to be addressed by any of the members of the team due to lack of clarity as to allocation of responsibility. An example of the type of problem that can arise is to be found in the case of Chesham Properties Ltd v. Bucknall Austin Project Management Services Ltd and Others (1997).

To avoid this kind of situation arising, an employer may appoint a single entity as an integrated multi-discipline professional team. This can take the form of a single multi-discipline consultancy practice taking overall responsibility for a number of consultancy services and carrying these out in-house, or a single discipline practice, normally the architect, engaging directly with the employer for a range of services and then sub-contracting these to other firms, such as civil and structural engineers and mechanical and electrical engineers. This provides the employer with ‘one-stop’ responsibility on the part of the architect, since in such circumstances (unless the appointment expressly states otherwise), the architect will be responsible for the performance of the services, including any design, by those to whom he has delegated such performance under a sub-contract. In contrast, the architect will have no responsibility (subject again to the terms of the appointment) for the work of other consultants whom the employer has appointed directly.

It may not always be the architect who assumes this single point of responsibility, as it is not uncommon for a project manager to enter into an appointment with the employer, which includes not only project management and CDM co-ordinator services, but also the full range of design services and, in turn, to sub-contract the design services to others. This is indeed the model used for the project manager-led integrated design team services which may be procured under the Government Procurement Services ‘Buying Solutions’ framework (see Section 1.4.9). In a design and build scenario, the design sub-consultants' appointments may in due course be novated to a contractor, with the project manager's appointment remaining with the employer.

In relation to novation of design appointments, see Section 12.7. It should also be borne in mind that though the most common practice in design and build contracts is for the employer's design team to be novated to the contractor, it is not unusual for the contractor to form its own design team by engaging sub-consultants directly. In practice, the more advanced the design at the time the contractor is appointed, the greater the likelihood of novation being appropriate.

The roles of the most commonly used consultants in construction projects are briefly described below, including the forms of consultant appointment produced by the relevant professional body. However, in many cases (and in almost all cases where the appointment is subject to the public procurement regime), the form of appointment will be selected by the employer. That is often a bespoke form of appointment rather than the professional body's standard form, though the use of the NEC3 Professional Services Contract has gained considerable popularity.

1.3.2 Architect

In a traditional building contract, it is the architect who usually has overall responsibility for the project from its conception to its conclusion. An architect is the agent of their client (in most cases, the employer, but under a design and build contract following novation, the contractor) and the general law of Scotland in relation to agency applies to their actions. The scope of their actual authority depends upon the terms of the agreement, comprising the appointment by their client.

Chartered architects in Scotland may be members of the Royal Incorporation of Architects in Scotland (RIAS) and/or the Royal Institute of British Architects (RIBA). The RIAS is a charitable organization founded in 1916 as the professional body for all chartered architects in Scotland. It is independent of the RIBA though it consults with the RIBA on UK-wide professional issues. The RIAS produces a suite of five Appointment documents, most recently revised in November 2011: SCA 2000; Sub Consultant Form of Appointment; ASP 2005 (Small Projects); Design and Build Appointment DBE/2000 (where the client is the employer); and Design and Build Appointment DBC/2000 (where the client is the contractor). The RIBA also publishes its own suite of contract documents for the appointment of architects, consultants and sub-consultants, the most recent edition of which is known as the RIBA Agreement 2010 (2012 Revision).

In a conventional building project, the architect will normally work in conjunction with the structural engineer, the former being engaged to produce at the initial stages the plans and elevations and an outline design, whereas the latter will be responsible for the design of the sub-structure and load-bearing elements of the building and for producing structural calculations and drawings. In May 2013, the RIBA launched a fairly radical change to its ‘Plan of Work’ which set out a recognized model for the building design and construction process, split into a number of stages, identified as A–L. The RIBA Plan of Work 2013 (endorsed by the RIAS) replaces these stages A–L with a new list of eight stages (along with eight ‘task bars’). The stated intention is to align these stages with the unified industry stages agreed with the Construction Industry Council (CIC). The wider aim of the new Plan of Work is to cover the various procurement routes, to emphasize the project team as a whole, including client, contractors and designers, and to integrate building information modelling (BIM) into the work process.

The eight stages contained in the RIBA Plan of Work 2013 are:

Stage 0 – Strategic Definition

Stage 1 – Preparation and Brief

Stage 2 – Concept Design

Stage 3 – Developed Design

Stage 4 – Technical Design

Stage 5 – Construction

Stage 6 – Handover and Close Out

Stage 7 – In Use.

The architect may also, if so appointed by the employer, act as certifier under the building contract and will normally fulfil that role as contractor administrator under the SBC (but not the SBC/DB). In exercising the role of certifier, the architect will have a duty of care to the employer (see below) but will not normally owe any duty of care to the contractor (Pacific Associates v. Baxter (1980)). For a full description of the role and responsibilities of the certifier, see Section 7.6.

The architect's duty to the employer in the performance of his obligations in relation to both design activities and other services under the appointment, as with any other professional consultant or adviser, is to use reasonable skill and care. Where the professional holds himself out as having a special skill, such as in the case of an architect, the standard of care is that of the ordinary skilled man exercising and professing to have such a skill (Bolam v. Friern Hospital Management Committee (1957)). In many cases this duty of care will be expressly set out in the appointment, but in the absence of such an express term, it will nonetheless be implied. That same standard will apply to the architect's duty of care to the employer where he is carrying out the function of certifier under the building contract on behalf of the employer. On the other hand, a stricter duty than that of exercising reasonable skill and care may, by agreement, be imposed on the architect by an express term to that effect. This will generally be resisted by the architect as his professional indemnity insurance will normally cover only acts of ‘negligence’, i.e. breaches of the common law duty of reasonable skill and care and not a breach of a higher contractual duty. It is also possible that a stricter ‘fitness for purpose’ duty may be implied as matter of fact on the appointment by the particular circumstances and what is demonstrated to be the common intention of the parties (Greaves & Co (Contractors) Ltd v. Baynham Meikle & Partners (1975)).

1.3.3 Quantity surveyor

A quantity surveyor may be engaged by the employer to discharge specific functions. These tend to be of a financial nature and can include, for example, acting as cost consultant in preparing cost estimates, preparing bills of quantities, valuing work done for the purposes of both interim and final certificates, ascertaining direct loss and expense under the provisions of the building contract, and preparing the final account. Like architects, chartered surveyors are members of a professional organization, in this case the Royal Institution of Chartered Surveyors (RICS), which was founded in 1861. It is now a world-wide organization, with RICS Scotland being one of the four UK regional divisions. The RICS produces a suite of documents for consultancy appointments. This consists of the core appointment (either the standard form of consultant's appointment or the short form of consultant's appointment, in each case with a separate version for use in Scotland) along with a standard schedule of services relevant to the appropriate discipline, i.e. building surveyor services, CDM co-ordinator services, employer's agent services, project manager services, project monitor services, and quantity surveyor services.

The various schedules of service mentioned above illustrate that the role of the chartered surveyor in a project may not be limited to the traditional, albeit still essential, role of quantity surveyor, but has expanded into other areas such as project management.

The traditional principal role of the quantity surveyor is to value the work carried out by the contractor, and not to inspect that work for quality (Sutcliffe v. Chippendale & Edmondson (1982)). This was clarified in the case of Dhamija v. Sunningdale Joineries and Others (2010) in which Coulson J held that a quantity surveyor is concerned with quantities, not the quality of the work, and that it was for the architect to advise the quantity surveyor, and not for the quantity surveyor to see for himself, any defective work which should be excluded from the valuation.

1.3.4 Engineer

Historically, contracts for the construction of infrastructure such as roads, tunnels, railways or bridges, where the design process is led by the civil engineer rather than the architect, have generally been known as engineering contracts (as opposed to contracts for ‘buildings’). In a traditional engineering contract, the engineer normally undertakes design responsibility and carries out a similar administrative role to that of the architect under a building contract, such as the certification of payments and of completion. The relevant UK professional organization for civil engineers is the Institution of Civil Engineers (ICE). There are also business associations for the consultancy and engineering industry such as the Association for Consultancy and Engineering (ACE), which in turn is represented on the European Federation of Engineering Consultancy Associations (EFCA) and the International Federation of Consulting Engineers, or Fédération Internationale des Ingénieurs-Conseils (FIDIC).

The Civil Engineering Contractors Association (CECA) is a representative association for the UK civil engineering contractors. The CECA in Scotland represents over 100 civil engineering contractors, ranging in size from small rural contractors to multinationals.

While civil engineers are concerned primarily with structures and the physical environment, mechanical engineers (almost invariably conjoined with electrical engineers and often referred to in that combined role as building services consultants) are responsible for the mechanical and electrical systems in a building. The professional institution in the UK for mechanical engineers is the Institution of Mechanical Engineers (IMechE), while the equivalent body for electrical engineers is the Institution of Engineering and Technology (IET) which was formed in 2006 by the merger of the Institution of Electrical Engineers (IEE) and Institution of Incorporated Engineers (IIE). The Chartered Association of Building Services Engineers (CIBSE) is the business organization that promotes building services engineers. This was formerly the Institution of Heating and Ventilating Engineers and was granted its Royal Charter in 1976.

In a typical building contract (as opposed to an engineering contract), the specialist consultant engineering input will be provided to the employer by the structural engineer and the mechanical and electrical (M&E) (or building services) engineer. As mentioned in Section 1.3.2, the structural engineer's role is normally the design of the sub-structure and load-bearing elements. The M&E consultant will be responsible for specifying the required mechanical and electrical installations and the outputs and performance standards, while in more complex projects the detailed M&E design will be the responsibility of specialist M&E sub-contractors engaged directly by the main contractor.

A recent case has considered the extent to which a structural engineer was entitled to rely on advice obtained from a specialist subcontractor in producing a soil stabilization performance specification for the purposes of construction of a new supermarket. In the event, the floor slab suffered differential settlement as a consequence of the ground under the floor slab not being improved enough. The employer, the supermarket owner, contended that the engineers could not avoid liability by arguing that they were entitled to rely on the advice of the specialist subcontractors. However, the court held that it was not a question of whether the engineers had delegated their duty to the subcontractors but whether they had acted with reasonable skill and care in relying on advice from a specialist subcontractor instead of carrying out their own assessment. The court held that a construction professional could discharge its duty to take reasonable care by relying on the advice or design of a specialist provided that it acts reasonably in doing so. In the circumstances of the case the engineers had acted reasonably in doing so, and would not have been in breach of their duty of care even if even the advice of the specialist had been negligent (Cooperative Group Ltd v. John Allen Associates Ltd (2010)).

1.3.5 Specialist consultants

In large building projects, employers often employ specialist consultants to advise on specific areas, for example, planning consultant, environment and sustainability consultant, fire consultant, landscape architect, heating and ventilation consultant, lift consultant, interior and space consultants, transport consultant. In most cases a CDM co-ordinator will require to be appointed. See Section 1.7 in relation to a BIM Information Manager and Section 1.8 on GSL Lead or Champion in respect of ‘Soft Landings’. The CIOB Complex Projects Contract 2013 referred to in Section 1.4.8 introduces a new role of ‘Project Time Manager’ to review progress, advise the employer's team on programming and work with the contractor to identify measures to recover delay. Additionally, the trend in recent years for building owners to demand that completed projects achieve a specified BREEAM rating has resulted in the emergence of the BREEAM consultant as a specialist. BREEAM (i.e. the BRE Environmental Assessment Method) is a means of assessing the overall environmental performance of new and existing buildings. In order to achieve one of the ratings of Pass, Good, Very Good, and Excellent, a minimum number of points must be achieved.

1.3.6 Project manager

Depending upon the size of the building contract and the method of procurement, the employer may decide to engage a project manager. Although in the past a project manager in the construction context tended to be found only in a construction management contract (see Section 1.4.1), the role is nowadays found in all types of construction procurement and normally covers the management and coordination of the tender process and the works, including advising on procurement strategy and risks, coordinating the preparation of tender documents and assessment of tenders, producing contract documents, programming and monitoring of progress. Ultimately, however, the exact scope and extent of the duties will be determined by the terms of the appointment. The role of the Project Manager acting as contract administrator is recognized in NEC 3 and a project manager is often appointed by the employer to undertake the role of employer's agent in SBC/DB. The extent of the project manager's responsibilities to their client has been considered in a number of recent cases. In Sweett (UK) Limited v. Michael Wight Homes Limited (2012), the employer's agent's appointment imposed an express duty on it to ‘prepare contract documentation and arrange for such documents to be executed’. The contractor was contractually obliged to provide a performance bond but went into liquidation after commencing work without having done so. The court rejected the employer's contention that the consultant was under an absolute obligation to arrange execution of the performance bond by the contractor and held that their duty was limited to using reasonable care to ensure it was provided. In the circumstances the consultant had fulfilled that duty. In contrast, in The Trustees of Ampleforth Abbey Trust v. Turner & Townsend Project Management Limited (2012), the project manager was held to have breached their duty to use reasonable care to ensure execution of the building contract by the contractor. The project manager had instead issued a series of letters of intent and had failed to warn the employer of the limited protection afforded by such letters as compared to a formal contract. As a consequence of the absence of a formal contract, the employer was unable to apply liquidated damages for delay against the contractor, and the court held the project manager liable to the employer for that loss.

1.3.7 Clerk of works

A clerk of works is generally employed on site by either the employer or the architect to act as construction inspector, oversee the execution of the works, and monitor compliance with the required contract standards. There is a professional body for clerks of works known as the Institute of Clerk of Works and Construction Inspectorate of Great Britain Inc (ICWCI). Clause 3.4 of SBC expressly permits the Employer to appoint a clerk of works whose duty is to act solely as inspector on behalf of the Employer under the directions of the Architect/Contract Administrator. The clerk of works cannot give any direction to the Contractor unless it is in regard to a matter in respect of which the Architect/Contract Administrator is expressly empowered by the Contract to issue instructions and the direction must be confirmed in writing by the Architect/Contract Administrator within two working days of being given. The corresponding role is carried out under NEC3 by the ‘Supervisor’ whose duties include the carrying out of tests and inspections, instructing the Contractor to search for defects, notifying the Contractor of defects, and issuing the defects certificate.

1.3.8 Contractor

Once an employer has decided upon the nature and extent of the work which they wish carried out (possibly with the assistance of the architect, quantity surveyor and/or project manager), they will usually invite one or more contractors to tender for the work. Where the employer is a contracting authority or a utility for the purposes of public procurement law (see Chapter 2), the mandatory rules in respect of competitive tendering will of course apply. The obligations of contractors under a building contract are considered in Chapter 5.

1.3.9 Sub-contractors

Often, and almost invariably in major projects, elements of the work are executed not by the main contractor itself but by sub-contractors or even sub-sub-contractors. These may include ‘domestic sub-contractors’ (chosen by the main contractor normally with the employer's consent); specialist contractors pre-named by the employer (which is not the same as nominated) or ‘works contractors’ (under a management contract). In the past these could also have included nominated sub-contractors.

The position of sub-contractors under a building contract is considered in Chapter 11.

In addition to the principal parties referred to above, other parties may have a role in a building project such as suppliers, insurers, funders, prospective tenants and purchasers of the building.

1.3.10 Experts

Some specialist consultants may be considered experts in their field. The use of expert witnesses in complex construction disputes is commonplace. An expert should act objectively and independently to avoid being viewed as no more than a hired gun. The expert witness or, to give him his proper title under Scots law, the ‘skilled witness’, is through practice or study, or both, specially qualified in a recognized branch of knowledge. A number of professional consultancy bodies, e.g. RIAS maintain a list of accredited expert witnesses.

The duties and responsibilities of experts in civil cases in England were set out in detail by Mr Justice Cresswell in National Justice Compañía Naviera SA v. Prudential Assurance Co. Ltd (‘The Ikarian Reefer’) (No. 1) (1993). These include the following:

Expert evidence presented to the court should be, and should be seen to be, the independent product of the expert uninfluenced as to form or content by the exigencies of litigation, see

Whitehouse

v.

Jordan

(1981).

An expert witness should provide independent assistance to the court by way of objective, unbiased opinion in relation to matters within his expertise, see

Polivitte Ltd

v.

Commercial Union Assurance Co. Plc

(1987) and

Re J (Child Abuse: Expert Guidance)

(1991). An expert witness should never assume the role of an advocate.

An expert witness should state the facts or assumption upon which his opinion is based. He should not omit to consider material facts which could detract from his concluded opinion, see

Re J

(1991).

An expert witness should make it clear when a particular question or issue falls outside his expertise.

If an expert's opinion is not properly researched because he considers that insufficient data is available, this must be stated with an indication that the opinion is no more than a provisional one, see

Re J

(1991). In cases where an expert witness who has prepared a report could not assert that the report contained the truth, the whole truth and nothing but the truth without some qualification, that qualification should be stated in the report, see

Derby & Co. Ltd and Others

v.