Provides a guide to the general principles of Scottish law relevant to construction contracts and the main provisions of the standard forms of construction contract used in Scotland including:
The new edition has been substantially updated and expanded to take account of the latest editions of the Scottish Standard Building Contracts and recent case law. Specific updates have been driven by the following changes to legislation and standard contracts
It also features new chapters on: litigation; competition; the Bribery Act 2010; and guarantees and bonds.
From reviews of previous editions:
Sie lesen das E-Book in den Legimi-Apps auf:
Seitenzahl: 1467
Veröffentlichungsjahr: 2014
Title Page
Copyright
Dedication
Foreword
Preface
Chapter 1: Construction Contracts in General
1.1 Introduction
1.2 Definition of a construction contract
1.3 Parties involved in a construction project
1.4 Types of construction contract
1.5 The SBCC forms of building contract
1.6 The NEC3 forms of contract
1.7 Building Information Modelling (BIM)
1.8 Soft Landings
Chapter 2: Procurement
2.1 Introduction
2.2 The EU public procurement regime and EU economic and legal principles
2.3 Beyond the EU
2.4 Conditions for application of the procurement rules
2.5 Who must comply with the Regulations?
2.6 Treatment of a proposed contract as a works contract, supply contract or a services contract
2.7 What are the relevant financial thresholds?
2.8 Is there an applicable exclusion?
2.9 Types of procurement procedure
2.10 The open procedure
2.11 The restricted procedure
2.12 The negotiated procedure with advertisement
2.13 The competitive dialogue procedure
2.14 Awarding the contract
2.15 The
Alcatel
mandatory standstill period
2.16 The use of framework agreements in public procurement
2.17 Remedies against contracting authorities (bidder grievances and complaints)
2.18 Awarding low-value contracts fairly
2.19 Forthcoming changes in the Procurement law landscape
Chapter 3: Entering into a Construction Contract
3.1 Introduction
3.2 Essentials of written and oral contracts
3.3 Capacity to contract
3.4 Implied terms
3.5 Letters of intent
3.6 Incorporation of terms by reference to another document
3.7 Contract interpretation
3.8 Signing a building contract
Chapter 4: Employers' Obligations
4.1 Introduction
4.2 Possession of the site
4.3 Administration
4.4 Information and instructions
4.5 Variations
4.6 Other obligations
Chapter 5: Contractors' Obligations
5.1 Introduction
5.2 Completing the works
5.3 The quality of the work
5.4 Defective work
5.5 Progress of the works
5.6 Insurance and indemnity
5.7 The Joint Fire Code
5.8 Health and safety
Chapter 6: Time
6.1 Introduction
6.2 Commencement of the works
6.3 Time of the essence
6.4 Progress of the works
6.5 Adjustment of the Completion Date and extension of time for completion
6.6 Partial possession, sectional completion and acceleration
6.7 Completion of the works
6.8 Damages for late completion
6.9 Liquidated damages
6.10 The SBC/DB
6.11 The NEC3
Chapter 7: Certification
7.1 Introduction
7.2 Formal requirements of certificates
7.3 Interim certificates
7.4 Final certificates
7.5 Other certificates
7.6 Roles and duties of certifiers
Chapter 8: Payment
8.1 Contractual payment
8.2 Adjustment of the contract price
8.3 Loss and expense
8.4 Quantum meruit
8.5 Quantum lucratus
8.6 Contractual retention
8.7 Project bank accounts (PBA)
Chapter 9: Ending a Construction Contract
9.1 Introduction
9.2 Frustration and impossibility
9.3 Force majeure
9.4 Termination
9.5 Repudiation and rescission
9.6 Death and illness
9.7 Illegality
9.8 Insolvency
9.9 Prescription
Chapter 10: Remedies
10.1 Introduction
10.2 Rescission
10.3 Specific implement
10.4 Damages for breach of contract
10.5 Finance charges
10.6 Interest
10.7 Interdict
10.8 Withholding payment
10.9 Suspending performance
10.10 Delictual claims
Chapter 11: Sub-contractors and Suppliers
11.1 Introduction
11.2 SBCC Standard Sub-Contracts
11.3 NEC3 Standard Sub-Contracts
11.4 Nominated and domestic sub-contractors
11.5 Named and specialist Sub-Contractors
11.6 Direct payments to sub-contractors
11.7 Privity of contract
11.8 Relationship between main and sub-contracts
11.9 Restrictions on sub-contracting
11.10 Main contractor's discount
11.11 Suppliers
11.12 Retention of title clauses
11.13 Supply of goods by sub-contractors
11.14 Adequate mechanism for payment
Chapter 12: Assignation, Delegation and Novation
12.1 Introduction
12.2 Common law
12.3 Effect of assignation upon claims
12.4 Delectus personae
12.5 Assignation under the SBC and the SBC/DB
12.6 Assignation under the NEC3
12.7 Delegation
12.8 Novation
Chapter 13: Rights for Third Parties
13.1 General
13.2 Collateral warranties
13.3 Typical clauses
13.4 Effects of the 1996 Act on collateral warranties
13.5 Third party rights schedule
13.6 Assignation
Chapter 14: Insurance
14.1 Insurance: General principles
14.2 Insurance under the SBC and the SBC/DB
14.3 Insurance under the NEC3
14.4 Professional indemnity insurance
14.5 Latent defects insurance
14.6 Project insurance
Chapter 15: Litigation
15.1 Introduction
15.2 The litigation process
Chapter 16: Adjudication
16.1 Introduction
16.2 The scope of Part II of the 1996 Act, as amended by the 2009 Act
16.3 The notice of adjudication
16.4 Appointment of the adjudicator
16.5 The referral notice
16.6 Conduct of the adjudication
16.7 The decision
16.8 Adjudicator's fees and costs/expenses of the parties
16.9 Liability of the adjudicator
16.10 Enforcement proceedings
16.11 Proceedings following adjudication
16.12 Human rights
16.13 Adjudication in PPP contracts
Chapter 17: Arbitration
17.1 Introduction
17.2 The Arbitration (Scotland) Act 2010
Chapter 18: Other Forms of Dispute Resolution
18.1 Mediation
18.2 Settlement agreements
18.3 Expert determination
18.4 Early neutral evaluation
18.5 Senior management review
18.6 Dispute boards
Chapter 19: Tax
19.1 Value Added Tax (VAT)
19.2 The Construction Industry Scheme
Chapter 20: Health and Safety
20.1 Introduction
20.2 Common law
20.3 Health and Safety at Work etc. Act 1974
20.4 The Construction (Design and Management) Regulations 2007
20.5 The SBC and the SBC/DB provisions
20.6 The NEC3 provisions
Chapter 21: Regulatory Matters: Competition in Construction
21.1 Competition law in the UK: Introduction
21.2 Competition law: Overview
21.3 Penalties
21.4 The Chapter I prohibition
21.5 The Roofing and English Construction cases
21.6 The cartel offence
21.7 Leniency
21.8 The Chapter II prohibition
21.9 Summary
Chapter 22: Regulatory Matters: The Bribery Act 2010
22.1 Compliance: The Bribery Act 2010
22.2 The Bribery Act 2010: The offences
22.3 The Bribery Act 2010: The defence
22.4 Facilitation payments
22.5 Consequences of offences under the Bribery Act
22.6 Prosecution under the Bribery Act
22.7 Construction industry risk profile
22.8 The SBC, the SBC/DB, the NEC3 and the Bribery Act
Chapter 23: Guarantees and Bonds
23.1 Guarantees
23.2 Bonds
Tables of Cases
Table of Statutes
Table of Statutory Instruments
Table of References
JCT Standard Form of Building Contract (2011 Edition) and the Standard Building Contract with Quantities for Use in Scotland SBC/Q/Scot (Revised November 2011)
Table of References to the Design and Build Contract for Use in Scotland, DB/Scot 2011 (Revised November 2011)
Table of References to the NEC3 Engineering and Construction Contract (Revised September 2011)
Index
Also of interest
End User License Agreement
xiii
xiv
xv
xvi
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
Cover
Table of Contents
Foreword
Preface
Begin Reading
Figure 5.1
Figure 8.1
Figure 8.2
Figure 8.3
Figure 8.4
Figure 8.5
Table 17.1
Table 17.2
Third Edition
MacRoberts
Solicitors
Foreword by
The Rt Hon Lord Hope of Craighead
This edition first published 2015
© 2015 by John Wiley & Sons, Ltd
Registered office
John Wiley & Sons, Ltd, The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom.
Editorial offices:
9600 Garsington Road, Oxford, OX4 2DQ, United Kingdom.
The Atrium, Southern Gate, Chichester, West Sussex, PO19 8SQ, United Kingdom.
For details of our global editorial offices, for customer services and for information about how to apply for permission to reuse the copyright material in this book please see our website at www.wiley.com/wiley-blackwell.
The right of the author to be identified as the author of this work has been asserted in accordance with the UK Copyright, Designs and Patents Act 1988.
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, except as permitted by the UK Copyright, Designs and Patents Act 1988, without the prior permission of the publisher.
Designations used by companies to distinguish their products are often claimed as trademarks. All brand names and product names used in this book are trade names, service marks, trademarks or registered trademarks of their respective owners. The publisher is not associated with any product or vendor mentioned in this book.
Limit of Liability/Disclaimer of Warranty: While the publisher and author(s) have used their best efforts in preparing this book, they make no representations or warranties with respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. It is sold on the understanding that the publisher is not engaged in rendering professional services and neither the publisher nor the author shall be liable for damages arising herefrom. If professional advice or other expert assistance is required, the services of a competent professional should be sought.
Library of Congress Cataloging-in-Publication Data
MacRoberts on Scottish building contracts
MacRoberts on Scottish construction contracts / MacRoberts Solicitors;
foreword by The Rt Hon Lord Hope of Craighead, KT.—Third edition.
pages cm
Includes bibliographical references and index.
ISBN 978-1-118-27345-6 (hardback)
1. Construction contracts— Scotland. I. MacRoberts (Firm), author. II. Title.
KDC501.M33 2014
343.41107′8624— dc23
2014016562
A catalogue record for this book is available from the British Library.
Wiley also publishes its books in a variety of electronic formats. Some content that appears in print may not be available in electronic books.
Cover images: iStockphoto © blackjake, iStockphoto © Martin McCarthy
Cover design by Jeffrey Goh
To David Henderson – without whom this book would never have seen the light of day. We are forever in his debt.
The Rt Hon Lord Hope of Craighead KT
A textbook of this kind, which seeks to serve the day-to-day needs of those who enter into and have to administer significant contractual relationships, must keep itself up to date if it is to do its work properly. This is no easy task, especially in a field such as that occupied by contracts entered into in the Scottish construction industry. There are many factors at work which promote changes in law and practice in this area. The standard forms are subject to constant revision to react to the demands of the marketplace. There are changes in the legislation, as it seeks to promote best practice in the industry, to react to the requirements of modern competition law and to combat the increasing menace of bribery. There is also a steady stream of case law, as the limits of existing rules and principles are constantly being tested to resolve the disputes that come before the courts. It was for this reason that I said in my Foreword to the first edition that I hoped that it might be possible for this book, like the forms, to be kept up to date by the issuing of revised editions at appropriate intervals. That indeed is what has happened and, as I welcome this third edition, I have not been disappointed.
As one would expect, the editors have been careful to take account of all these changes. But this has not just been a mechanical exercise. Several important editorial initiatives have been taken to keep pace with changes in practice. At the time of the first edition the standard forms that were most commonly used in the industry in Scotland were those published by the Scottish Building Contracts Committee (the SBCC). As was to be expected, the focus in that edition was on those standard forms. But the New Engineering (NEC3) forms of contract have grown in popularity throughout the United Kingdom, especially in the public sector. So it made sense for them to be given equal consideration in this new edition together with the SBCC forms. Also the focus in previous editions was on the With Quantities version of the Scottish Building Contract which was the version that was most frequently used at that time. This edition has broadened its outlook by including an analysis of important differences between that version and the Design and Build form of contract. This is to be welcomed, as design and build is being increasingly used as the preferred method of procurement in major projects. Chapter 1 also has an extended commentary on professional consultants, who have an increasing role in projects of that kind.
Chapter 17 on arbitration has been rewritten to provide a detailed commentary on the Arbitration (Scotland) Act 2010, and two new chapters have been added. One (Chapter 21) deals with the increasingly important matter of competition law in the context of the construction industry, to which the Office of Fair Trading is now paying close attention. It is plain from its enforcement activities that contractors and those engaged in the supply chain need to be aware of the rules and to conduct their own activities accordingly. The other (Chapter 22) deals with the far-reaching measures introduced by the Bribery Act 2010, which are of concern to everyone engaged in the construction industry both domestically and internationally. As the editors point out, the construction industry is one of the sectors which is likely to be the focus of investigating authorities because of the complex framework of contracts that it routinely uses and the cross-border and international nature of its activities. The penalties for those found guilty of offences are severe. This chapter is essential reading for those in positions of responsibility throughout the industry.
There is more than a hint of unfinished business. At the end of the chapter on procurement we are told that this area of the law is currently undergoing significant transformation as new Public Procurement Directives were adopted by the European Parliament in January 2014 and a Procurement Reform (Scotland) Bill, which will enable Scottish Ministers to make regulations as to the assessment of bidder suitability to tender for public contracts, has been introduced into the Scottish Parliament. The Courts Reform (Scotland) Bill, which will set out the framework for the implementation of the programme of reform of the Scottish Civil Justice system recommended in Lord Gill's Report, is currently passing through the Parliament also. So there are important changes on the way with which this edition cannot deal. Then there is the problem that has been created by differences in approach between the English and the Scottish Courts regarding the question whether a contractor is entitled to an extension of time where there are concurrent causes of delay. The editors express a clear preference for Lord Carloway's impressive dissenting judgment in the Inner House in the City Inn case, which is in harmony with the English approach. It would not be in the least surprising if the UK Supreme Court, by which the issue must surely now be resolved as soon as possible, were to agree with them.
The editors are, of course, entitled to a well-earned rest from their labours. Users of the book will no doubt hope that a fourth edition will be forthcoming before too long, so that it will continue to serve so well the needs of busy practitioners. For the time, however, they will be grateful for the practical approach that it takes to the many issues with which it deals, the broader coverage that it gives to the forms of contract and for the clear and accessible way that its guidance is presented.
David Hope
In the Preface to the second edition of this book published in 2007, we remarked upon the significant changes in the landscape of construction contracts since the first edition published eight years earlier. Predictably, exactly the same can be said about this third edition. It is, however, not only the law of construction contracts which continues to spin down Tennyson's ringing grooves of change, but also the practice of the users of such contracts. While the previous editions focussed on the SBCC With Quantities and Design and Build standard forms of building contract, the third edition gives equal prominence to the NEC3 Engineering and Construction Contract, an editorial decision made somewhat inevitable by the increasing use in Scotland of that contract. Perhaps not so inevitable was the decision to change the title of the book from MacRoberts on Scottish Building Contracts to MacRoberts on Scottish Construction Contracts, but we think that the latter reflects what has become the more commonly used terminology.
We are indebted to Lord Hope of Craighead for providing, as he did for the first edition, the Foreword. In that Foreword, he mentions a number of the other changes which have demanded substantial revisions to the relevant chapters, most notably to take account of the long-awaited (and welcome) Arbitration (Scotland) Act 2010 and the significant amendments to Part II of the Housing Grants, Construction and Regeneration Act 1996. Completely new chapters dealing with competition law and the Bribery Act illustrate the increasing impact on construction law of the expanding regulatory environment.
It is also interesting to note that while (as pointed out in the last edition) there remains a close relationship between the law of Scotland and that of England, the courts of the respective jurisdictions do not always reach the same result on the same point, as demonstrated by the schism between the ‘English approach’ and the ‘Scottish approach’ following the decision of the Scottish court in City Inn v Shepherd Construction (see Chapter 6).
In addition to those of the editors, individual contributions have been provided by our colleagues: David Arnott, Richard Barrie, Neil Kelly, Duncan Osler, Robin Fallas, Sarah Pengelly, Madeleine Young, David Wilson, Alison Horner, Julie Hamilton, Jennifer McKay, Ainsley MacLaren, Colette McGinley, John Reid, David Flint and Valerie Surgenor, and our now former colleagues Alexandra Lavery and Gavin Thomson. Alan McAdams, yet again, has provided invaluable support to many, if not all, of the contributors, and Jennifer Burns, Kate Moffett and Magdalena Urbanowska played an invaluable role in preparing tables and checking drafts.
Finally, our thanks to Paul Sayer and all of his colleagues at Wiley for their patience and support.
We have endeavoured to state the law as at 1 July 2014.
David HendersonCraig TurnbullShona FrameMacRoberts LLP60 York StreetGlasgow
Numerous books have been written on the subject of construction contracts. However, many of those are of a specialist nature and most are written from the perspective of English law. The aim of this book is to provide a practical guide to construction contracts governed by the law of Scotland.
There is no doubt that the construction industry not only in Scotland, but throughout the UK, is currently being presented with continuing challenges of an almost unprecedented nature. In the first quarter of 2013, the construction industry suffered a contraction of 2.5% compared with the same period in the previous year, despite a growth in overall Scottish gross domestic product (GDP) of 1.2%. While some major public sector infrastructure projects have lessened the impact of the economic downturn on the Scottish construction sector, the lack of external funding has been a major factor in the sharp reduction in the number of new private commercial development projects.
However, the very size of the construction industry means that it is of huge significance to the economy. According to figures contained in the report by Construction Scotland, Building for the Future: The Scottish Construction Industry's Strategy, 2013–2016, the construction industry generates £27.4 billion (GDP) to the Scottish economy every year, contributing 10% of Scotland's total economic output, and 170,000 people work in construction in Scotland, around 10% of the total Scottish jobs.
The definition of a construction contract is not straightforward. The construction industry encompasses building and engineering projects which differ enormously in nature, size and complexity. The terms ‘building contract’ and ‘construction contract’ are often used interchangeably. The term ‘construction contract’ was given a statutory meaning for the first time by section 104 of the Housing Grants, Construction and Regeneration Act 1996 (‘the 1996 Act’) and the breadth of the definition illustrates the wide-ranging nature of construction contracts. The 1996 Act has been amended by the Local Democracy, Economic Development and Construction Act 2009 in relation to contracts entered into in England and Wales from 1 October 2011 and in Scotland from 1 November 2011. One of the key amendments was the repeal of the requirement that a construction contract for the purposes of the 1996 Act must be in writing. The following sections summarize the principal requirements of the statutory definition of ‘construction contract’. However, it is important to bear in mind that this statutory definition is relevant only for the purposes of the 1996 Act and for determining whether the provisions of Part II the 1996 Act, such as adjudication and payment requirements, will apply to a particular contract. The fact that a contract is not a ‘construction contract’ for the purposes of the 1996 Act does not mean that it may not be a construction contract in the commonly understood sense of the term, and indeed some contracts falling with the statutory definition, such as for architectural services, would not be described as a construction contract in everyday terms. An English court has recently held that a collateral warranty may, depending on its terms, be a construction contract for the purposes of the 1996 Act and thus subject to the statutory adjudication provisions, see Parkwood Leisure Ltd v. Laing O'Rourke Wales and West Ltd (2013) and the discussion of this case in Section 13.4. The 1996 Act has no relevance in determining whether a contract exists in the first place since this will be determined by a matter of law and evidence; putting it at its simplest, whether there was sufficient consensus as to the essential terms and sufficient proof of such consensus.
It should also be noted that the Scottish Government's legislative programme for 2013–2014 includes the Conclusion of Contracts, etc. Bill, which is intended to allow contracts to be concluded by email and to provide a simpler process for formal execution (signing) of contracts.
Part II of the 1996 Act applies to ‘construction contracts’, being agreements in relation to ‘construction operations’. These terms are defined respectively by sections 104 and 105.
Section 104 provides as follows:
In this Part a ‘construction contract’ means an agreement with a person for any of the following
–
the carrying out of construction operations;
arranging for the carrying out of construction operations by others, whether under sub-contract to him or otherwise;
providing his own labour, or the labour of others, for the carrying out of construction operations
.
References in this Part to a construction contract include an agreement
–
to do architectural, design or surveying work, or
to provide advice on building, engineering, interior or exterior decoration or on the laying-out of landscape, in relation to construction operations
.
References in this Part to a construction contract do not include a contract of employment (within the meaning of the Employment Rights Act 1996)
.
The Secretary of State may by order add to, amend or repeal any of the provisions of subsection (1), (2) or (3) as to the agreements which are construction contracts for the purposes of this Part or are to be taken or not to be taken as included in references to such contracts …
It will be noted that the 1996 Act applies to matters beyond the carrying out of building works. It applies to architectural, design and surveying works and to advising on building, engineering, interior or exterior decoration or on the laying-out of landscape in relation to construction operations.
The definition of ‘construction operations’ is central to Part II. This term is defined by section 105(1) which provides as follows:
In this Part ‘construction operations’ means, subject as follows, operations of any of the following descriptions
–
construction, alteration, repair, maintenance, extension, demolition or dismantling of buildings, or structures forming, or to form, part of the land (whether permanent or not);
construction, alteration, repair, maintenance, extension, demolition or dismantling of any works forming, or to form, part of the land, including (without prejudice to the foregoing) walls, roadworks, power-lines, electronic communications apparatus, aircraft runways, docks and harbours, railways, inland waterways, pipe-lines, reservoirs, water-mains, wells, sewers, industrial plant and installations for purposes of land drainage, coast protection or defence;
installation in any building or structure of fittings forming part of the land, including (without prejudice to the foregoing) systems of heating, lighting, air-conditioning, ventilation, power supply, drainage, sanitation, water supply or fire protection, or security or communications systems;
external or internal cleaning of buildings and structures, so far as carried out in the course of their construction, alteration, repair, extension or restoration;
operations which form an integral part of, or are preparatory to, or are for rendering complete, such operations as are previously described in this subsection, including site clearance, earthmoving, excavation, tunnelling and boring, laying of foundations, erection, maintenance or dismantling of scaffolding, site restoration, landscaping and the provision of roadways and other access works;
painting or decorating the internal or external surfaces of any building or structure
.
Section 105(2) details a number of operations that are not construction operations for the purposes of Part II. The exceptions relate to oil and gas and mining, both underground and opencast; certain specified operations on a site where the primary purpose is nuclear processing, power generation, water or effluent treatment or the production, transmission, processing or bulk storage (other than warehousing) of chemicals, pharmaceuticals, oil, gas, steel or food and drink; the manufacture or delivery to site of components or equipment where the contract does not also provide for their installation; and the making, installation and repair of wholly artistic works. The scope of excluded operations insofar as applicable to works at power stations was considered in the case of North Midland Construction plc v. AE & E Lentjes UK Ltd (2009).
Section 106 provides that contracts with residential occupiers are excluded from the operation of Part II of the 1996 Act, as is any other description of construction contract excluded by order of the Secretary of State (or in Scotland, the Scottish Ministers).
A construction contract with a residential occupier is one which principally relates to operations on a dwelling which one of the parties to the contract occupies, or intends to occupy, as his residence.
The term ‘dwelling’ means a dwelling-house or a flat; and for s.106(2) ‘dwelling-house’ does not include a building containing a flat and ‘flat’ means separate and self-contained premises constructed or adapted for use for residential purposes and forming part of a building from some other part of which the premises are divided horizontally. In itself, section 106 is self-explanatory. However, it should be noted that a residential occupier cannot be a limited company for the purposes of this section, see Absolute Rentals Ltd v. Gencor Enterprises Ltd (2001).
The Construction Contracts (Scotland) Exclusion Order 1998 (‘the 1998 Order’) came into force with Part II of the 1996 Act on 1 May 1998. This excluded from the scope of Part II of the 1996 Act project agreements under the Private Finance Initiative (PFI) (provided certain criteria were met) but not sub-contracts such as the construction contract and facilities management or operation and maintenance contract. One of the amendments to the 1996 Act referred to in section 1.2.1 above was the introduction of section 110(1A) which prohibits payment provisions in construction contracts which are conditional on the performance of obligations under another contract or a decision by any person as to whether obligations under another contract have been performed. To avoid this prohibition applying to first-tier sub-contracts under PFI projects and thus prohibiting what are commonly known as ‘equivalent project relief’ clauses in such sub-contracts, the Construction Contracts (Scotland) Exclusion Order 2011 excludes from the operation of section 110(1A) a construction contract if it is a contract pursuant to which a party to a relevant contract (i.e. excluded by the 1998 Order) has subcontracted obligations under that contract to carry out construction operations.
Certain development agreements are also excluded from the operation of Part II under article 6 of the 1998 Order. A contract is a development agreement if it includes provision for the grant or disposal of a relevant interest in the land on which take place the principal construction operations to which the contract relates.
A relevant interest in land means either ownership or a tenant's interest under a lease for a period which is to expire not earlier than 12 months after the completion of the construction operations under the contract.
In Captiva Estates Ltd v. Rybarn Ltd (In Administration) (2006), Captiva entered into a contract with Rybarn to construct 28 flats. Captiva owned the land on which the development was to take place. The contract provided that, as consideration for the works, Captiva would pay Rybarn and would also grant to Rybarn an option to purchase leases in respect of 7 of the 28 flats. The question arose as to whether the contract was a development agreement within the meaning of the English equivalent to the 1998 Order. The court held that the definition of a ‘development agreement’ in the 1998 Order is wide and the contract was caught by it.
Section 107 of the 1996 Act as originally enacted provided that Part II only applied to agreements in writing or evidenced in writing or recorded by one of the parties or a third party who has been duly authorized to do so. However, this was repealed with effect from 1 October 2011 in England and 1 November 2011 in Scotland, which means that oral contracts may now be subject to Part II of the 1996 Act. This does not, however, avoid the practical difficulty of proving the terms, or even the existence, of an oral contract in the first place.
The parties involved in a building project can vary considerably depending on the nature and complexity of the project. At one end of the scale, a private individual may engage a joiner, electrician or builder to carry out work to his home. In such an instance, the employment of anyone other than the tradesman or builder may not be necessary. At the other end of the scale, major projects, such as the construction of public buildings, motorways, hotels or power stations, can involve a considerable number of parties from different professional and non-professional disciplines. It is therefore crucial to identify, particularly in a large project, the parties involved in that project, the terms of their respective appointments, the scope of each individual's involvement, and their roles within the project. The following parties are commonly involved in building projects:
The term ‘employer’ is used throughout this book as meaning the party for whose benefit the building works are being carried out. This is the term generally used in the standard form building contracts and associated documentation. Other terms such as ‘the owner’, ‘the client’ or ‘the authority’ are also sometimes used. The employer usually assembles the advisory team, though there is no obligation to do so (see obligations of employers in Chapter 4) and smaller projects often do not require the involvement of anyone other than the employer and the contractor. The nature of the team varies depending upon the nature of the project and the choice of procurement method. In the case of a large project, the team may consist of an architect, civil and structural engineer, mechanical and electrical engineer, quantity surveyor, construction design and management (CDM) co-ordinator, one or more specialist consultants depending on the nature of the project, such as environmental consultant, acoustic consultant, etc., and possibly a project manager, a clerk of works and a BIM information manager (see Section 1.7). The team will also vary depending on the procurement method chosen, e.g. design and build, and may also be transferred at a later stage, at least in part, to the contractor in the case of novation (see Section 12.7). The terms of appointment of each member of the team are very important and must ensure that each member's obligations are clearly defined. Where this is not done, difficulties can arise with unnecessary overlap of work or, more importantly, in crucial issues failing to be addressed by any of the members of the team due to lack of clarity as to allocation of responsibility. An example of the type of problem that can arise is to be found in the case of Chesham Properties Ltd v. Bucknall Austin Project Management Services Ltd and Others (1997).
To avoid this kind of situation arising, an employer may appoint a single entity as an integrated multi-discipline professional team. This can take the form of a single multi-discipline consultancy practice taking overall responsibility for a number of consultancy services and carrying these out in-house, or a single discipline practice, normally the architect, engaging directly with the employer for a range of services and then sub-contracting these to other firms, such as civil and structural engineers and mechanical and electrical engineers. This provides the employer with ‘one-stop’ responsibility on the part of the architect, since in such circumstances (unless the appointment expressly states otherwise), the architect will be responsible for the performance of the services, including any design, by those to whom he has delegated such performance under a sub-contract. In contrast, the architect will have no responsibility (subject again to the terms of the appointment) for the work of other consultants whom the employer has appointed directly.
It may not always be the architect who assumes this single point of responsibility, as it is not uncommon for a project manager to enter into an appointment with the employer, which includes not only project management and CDM co-ordinator services, but also the full range of design services and, in turn, to sub-contract the design services to others. This is indeed the model used for the project manager-led integrated design team services which may be procured under the Government Procurement Services ‘Buying Solutions’ framework (see Section 1.4.9). In a design and build scenario, the design sub-consultants' appointments may in due course be novated to a contractor, with the project manager's appointment remaining with the employer.
In relation to novation of design appointments, see Section 12.7. It should also be borne in mind that though the most common practice in design and build contracts is for the employer's design team to be novated to the contractor, it is not unusual for the contractor to form its own design team by engaging sub-consultants directly. In practice, the more advanced the design at the time the contractor is appointed, the greater the likelihood of novation being appropriate.
The roles of the most commonly used consultants in construction projects are briefly described below, including the forms of consultant appointment produced by the relevant professional body. However, in many cases (and in almost all cases where the appointment is subject to the public procurement regime), the form of appointment will be selected by the employer. That is often a bespoke form of appointment rather than the professional body's standard form, though the use of the NEC3 Professional Services Contract has gained considerable popularity.
In a traditional building contract, it is the architect who usually has overall responsibility for the project from its conception to its conclusion. An architect is the agent of their client (in most cases, the employer, but under a design and build contract following novation, the contractor) and the general law of Scotland in relation to agency applies to their actions. The scope of their actual authority depends upon the terms of the agreement, comprising the appointment by their client.
Chartered architects in Scotland may be members of the Royal Incorporation of Architects in Scotland (RIAS) and/or the Royal Institute of British Architects (RIBA). The RIAS is a charitable organization founded in 1916 as the professional body for all chartered architects in Scotland. It is independent of the RIBA though it consults with the RIBA on UK-wide professional issues. The RIAS produces a suite of five Appointment documents, most recently revised in November 2011: SCA 2000; Sub Consultant Form of Appointment; ASP 2005 (Small Projects); Design and Build Appointment DBE/2000 (where the client is the employer); and Design and Build Appointment DBC/2000 (where the client is the contractor). The RIBA also publishes its own suite of contract documents for the appointment of architects, consultants and sub-consultants, the most recent edition of which is known as the RIBA Agreement 2010 (2012 Revision).
In a conventional building project, the architect will normally work in conjunction with the structural engineer, the former being engaged to produce at the initial stages the plans and elevations and an outline design, whereas the latter will be responsible for the design of the sub-structure and load-bearing elements of the building and for producing structural calculations and drawings. In May 2013, the RIBA launched a fairly radical change to its ‘Plan of Work’ which set out a recognized model for the building design and construction process, split into a number of stages, identified as A–L. The RIBA Plan of Work 2013 (endorsed by the RIAS) replaces these stages A–L with a new list of eight stages (along with eight ‘task bars’). The stated intention is to align these stages with the unified industry stages agreed with the Construction Industry Council (CIC). The wider aim of the new Plan of Work is to cover the various procurement routes, to emphasize the project team as a whole, including client, contractors and designers, and to integrate building information modelling (BIM) into the work process.
The eight stages contained in the RIBA Plan of Work 2013 are:
Stage 0 – Strategic Definition
Stage 1 – Preparation and Brief
Stage 2 – Concept Design
Stage 3 – Developed Design
Stage 4 – Technical Design
Stage 5 – Construction
Stage 6 – Handover and Close Out
Stage 7 – In Use.
The architect may also, if so appointed by the employer, act as certifier under the building contract and will normally fulfil that role as contractor administrator under the SBC (but not the SBC/DB). In exercising the role of certifier, the architect will have a duty of care to the employer (see below) but will not normally owe any duty of care to the contractor (Pacific Associates v. Baxter (1980)). For a full description of the role and responsibilities of the certifier, see Section 7.6.
The architect's duty to the employer in the performance of his obligations in relation to both design activities and other services under the appointment, as with any other professional consultant or adviser, is to use reasonable skill and care. Where the professional holds himself out as having a special skill, such as in the case of an architect, the standard of care is that of the ordinary skilled man exercising and professing to have such a skill (Bolam v. Friern Hospital Management Committee (1957)). In many cases this duty of care will be expressly set out in the appointment, but in the absence of such an express term, it will nonetheless be implied. That same standard will apply to the architect's duty of care to the employer where he is carrying out the function of certifier under the building contract on behalf of the employer. On the other hand, a stricter duty than that of exercising reasonable skill and care may, by agreement, be imposed on the architect by an express term to that effect. This will generally be resisted by the architect as his professional indemnity insurance will normally cover only acts of ‘negligence’, i.e. breaches of the common law duty of reasonable skill and care and not a breach of a higher contractual duty. It is also possible that a stricter ‘fitness for purpose’ duty may be implied as matter of fact on the appointment by the particular circumstances and what is demonstrated to be the common intention of the parties (Greaves & Co (Contractors) Ltd v. Baynham Meikle & Partners (1975)).
A quantity surveyor may be engaged by the employer to discharge specific functions. These tend to be of a financial nature and can include, for example, acting as cost consultant in preparing cost estimates, preparing bills of quantities, valuing work done for the purposes of both interim and final certificates, ascertaining direct loss and expense under the provisions of the building contract, and preparing the final account. Like architects, chartered surveyors are members of a professional organization, in this case the Royal Institution of Chartered Surveyors (RICS), which was founded in 1861. It is now a world-wide organization, with RICS Scotland being one of the four UK regional divisions. The RICS produces a suite of documents for consultancy appointments. This consists of the core appointment (either the standard form of consultant's appointment or the short form of consultant's appointment, in each case with a separate version for use in Scotland) along with a standard schedule of services relevant to the appropriate discipline, i.e. building surveyor services, CDM co-ordinator services, employer's agent services, project manager services, project monitor services, and quantity surveyor services.
The various schedules of service mentioned above illustrate that the role of the chartered surveyor in a project may not be limited to the traditional, albeit still essential, role of quantity surveyor, but has expanded into other areas such as project management.
The traditional principal role of the quantity surveyor is to value the work carried out by the contractor, and not to inspect that work for quality (Sutcliffe v. Chippendale & Edmondson (1982)). This was clarified in the case of Dhamija v. Sunningdale Joineries and Others (2010) in which Coulson J held that a quantity surveyor is concerned with quantities, not the quality of the work, and that it was for the architect to advise the quantity surveyor, and not for the quantity surveyor to see for himself, any defective work which should be excluded from the valuation.
Historically, contracts for the construction of infrastructure such as roads, tunnels, railways or bridges, where the design process is led by the civil engineer rather than the architect, have generally been known as engineering contracts (as opposed to contracts for ‘buildings’). In a traditional engineering contract, the engineer normally undertakes design responsibility and carries out a similar administrative role to that of the architect under a building contract, such as the certification of payments and of completion. The relevant UK professional organization for civil engineers is the Institution of Civil Engineers (ICE). There are also business associations for the consultancy and engineering industry such as the Association for Consultancy and Engineering (ACE), which in turn is represented on the European Federation of Engineering Consultancy Associations (EFCA) and the International Federation of Consulting Engineers, or Fédération Internationale des Ingénieurs-Conseils (FIDIC).
The Civil Engineering Contractors Association (CECA) is a representative association for the UK civil engineering contractors. The CECA in Scotland represents over 100 civil engineering contractors, ranging in size from small rural contractors to multinationals.
While civil engineers are concerned primarily with structures and the physical environment, mechanical engineers (almost invariably conjoined with electrical engineers and often referred to in that combined role as building services consultants) are responsible for the mechanical and electrical systems in a building. The professional institution in the UK for mechanical engineers is the Institution of Mechanical Engineers (IMechE), while the equivalent body for electrical engineers is the Institution of Engineering and Technology (IET) which was formed in 2006 by the merger of the Institution of Electrical Engineers (IEE) and Institution of Incorporated Engineers (IIE). The Chartered Association of Building Services Engineers (CIBSE) is the business organization that promotes building services engineers. This was formerly the Institution of Heating and Ventilating Engineers and was granted its Royal Charter in 1976.
In a typical building contract (as opposed to an engineering contract), the specialist consultant engineering input will be provided to the employer by the structural engineer and the mechanical and electrical (M&E) (or building services) engineer. As mentioned in Section 1.3.2, the structural engineer's role is normally the design of the sub-structure and load-bearing elements. The M&E consultant will be responsible for specifying the required mechanical and electrical installations and the outputs and performance standards, while in more complex projects the detailed M&E design will be the responsibility of specialist M&E sub-contractors engaged directly by the main contractor.
A recent case has considered the extent to which a structural engineer was entitled to rely on advice obtained from a specialist subcontractor in producing a soil stabilization performance specification for the purposes of construction of a new supermarket. In the event, the floor slab suffered differential settlement as a consequence of the ground under the floor slab not being improved enough. The employer, the supermarket owner, contended that the engineers could not avoid liability by arguing that they were entitled to rely on the advice of the specialist subcontractors. However, the court held that it was not a question of whether the engineers had delegated their duty to the subcontractors but whether they had acted with reasonable skill and care in relying on advice from a specialist subcontractor instead of carrying out their own assessment. The court held that a construction professional could discharge its duty to take reasonable care by relying on the advice or design of a specialist provided that it acts reasonably in doing so. In the circumstances of the case the engineers had acted reasonably in doing so, and would not have been in breach of their duty of care even if even the advice of the specialist had been negligent (Cooperative Group Ltd v. John Allen Associates Ltd (2010)).
In large building projects, employers often employ specialist consultants to advise on specific areas, for example, planning consultant, environment and sustainability consultant, fire consultant, landscape architect, heating and ventilation consultant, lift consultant, interior and space consultants, transport consultant. In most cases a CDM co-ordinator will require to be appointed. See Section 1.7 in relation to a BIM Information Manager and Section 1.8 on GSL Lead or Champion in respect of ‘Soft Landings’. The CIOB Complex Projects Contract 2013 referred to in Section 1.4.8 introduces a new role of ‘Project Time Manager’ to review progress, advise the employer's team on programming and work with the contractor to identify measures to recover delay. Additionally, the trend in recent years for building owners to demand that completed projects achieve a specified BREEAM rating has resulted in the emergence of the BREEAM consultant as a specialist. BREEAM (i.e. the BRE Environmental Assessment Method) is a means of assessing the overall environmental performance of new and existing buildings. In order to achieve one of the ratings of Pass, Good, Very Good, and Excellent, a minimum number of points must be achieved.
Depending upon the size of the building contract and the method of procurement, the employer may decide to engage a project manager. Although in the past a project manager in the construction context tended to be found only in a construction management contract (see Section 1.4.1), the role is nowadays found in all types of construction procurement and normally covers the management and coordination of the tender process and the works, including advising on procurement strategy and risks, coordinating the preparation of tender documents and assessment of tenders, producing contract documents, programming and monitoring of progress. Ultimately, however, the exact scope and extent of the duties will be determined by the terms of the appointment. The role of the Project Manager acting as contract administrator is recognized in NEC 3 and a project manager is often appointed by the employer to undertake the role of employer's agent in SBC/DB. The extent of the project manager's responsibilities to their client has been considered in a number of recent cases. In Sweett (UK) Limited v. Michael Wight Homes Limited (2012), the employer's agent's appointment imposed an express duty on it to ‘prepare contract documentation and arrange for such documents to be executed’. The contractor was contractually obliged to provide a performance bond but went into liquidation after commencing work without having done so. The court rejected the employer's contention that the consultant was under an absolute obligation to arrange execution of the performance bond by the contractor and held that their duty was limited to using reasonable care to ensure it was provided. In the circumstances the consultant had fulfilled that duty. In contrast, in The Trustees of Ampleforth Abbey Trust v. Turner & Townsend Project Management Limited (2012), the project manager was held to have breached their duty to use reasonable care to ensure execution of the building contract by the contractor. The project manager had instead issued a series of letters of intent and had failed to warn the employer of the limited protection afforded by such letters as compared to a formal contract. As a consequence of the absence of a formal contract, the employer was unable to apply liquidated damages for delay against the contractor, and the court held the project manager liable to the employer for that loss.
A clerk of works is generally employed on site by either the employer or the architect to act as construction inspector, oversee the execution of the works, and monitor compliance with the required contract standards. There is a professional body for clerks of works known as the Institute of Clerk of Works and Construction Inspectorate of Great Britain Inc (ICWCI). Clause 3.4 of SBC expressly permits the Employer to appoint a clerk of works whose duty is to act solely as inspector on behalf of the Employer under the directions of the Architect/Contract Administrator. The clerk of works cannot give any direction to the Contractor unless it is in regard to a matter in respect of which the Architect/Contract Administrator is expressly empowered by the Contract to issue instructions and the direction must be confirmed in writing by the Architect/Contract Administrator within two working days of being given. The corresponding role is carried out under NEC3 by the ‘Supervisor’ whose duties include the carrying out of tests and inspections, instructing the Contractor to search for defects, notifying the Contractor of defects, and issuing the defects certificate.
Once an employer has decided upon the nature and extent of the work which they wish carried out (possibly with the assistance of the architect, quantity surveyor and/or project manager), they will usually invite one or more contractors to tender for the work. Where the employer is a contracting authority or a utility for the purposes of public procurement law (see Chapter 2), the mandatory rules in respect of competitive tendering will of course apply. The obligations of contractors under a building contract are considered in Chapter 5.
Often, and almost invariably in major projects, elements of the work are executed not by the main contractor itself but by sub-contractors or even sub-sub-contractors. These may include ‘domestic sub-contractors’ (chosen by the main contractor normally with the employer's consent); specialist contractors pre-named by the employer (which is not the same as nominated) or ‘works contractors’ (under a management contract). In the past these could also have included nominated sub-contractors.
The position of sub-contractors under a building contract is considered in Chapter 11.
In addition to the principal parties referred to above, other parties may have a role in a building project such as suppliers, insurers, funders, prospective tenants and purchasers of the building.
Some specialist consultants may be considered experts in their field. The use of expert witnesses in complex construction disputes is commonplace. An expert should act objectively and independently to avoid being viewed as no more than a hired gun. The expert witness or, to give him his proper title under Scots law, the ‘skilled witness’, is through practice or study, or both, specially qualified in a recognized branch of knowledge. A number of professional consultancy bodies, e.g. RIAS maintain a list of accredited expert witnesses.
The duties and responsibilities of experts in civil cases in England were set out in detail by Mr Justice Cresswell in National Justice Compañía Naviera SA v. Prudential Assurance Co. Ltd (‘The Ikarian Reefer’) (No. 1) (1993). These include the following:
Expert evidence presented to the court should be, and should be seen to be, the independent product of the expert uninfluenced as to form or content by the exigencies of litigation, see
Whitehouse
v.
Jordan
(1981).
An expert witness should provide independent assistance to the court by way of objective, unbiased opinion in relation to matters within his expertise, see
Polivitte Ltd
v.
Commercial Union Assurance Co. Plc
(1987) and
Re J (Child Abuse: Expert Guidance)
(1991). An expert witness should never assume the role of an advocate.
An expert witness should state the facts or assumption upon which his opinion is based. He should not omit to consider material facts which could detract from his concluded opinion, see
Re J
(1991).
An expert witness should make it clear when a particular question or issue falls outside his expertise.
If an expert's opinion is not properly researched because he considers that insufficient data is available, this must be stated with an indication that the opinion is no more than a provisional one, see
Re J
(1991). In cases where an expert witness who has prepared a report could not assert that the report contained the truth, the whole truth and nothing but the truth without some qualification, that qualification should be stated in the report, see
Derby & Co. Ltd and Others
v.